Before releasing the work, the team identifies this condition: work is directly overhead on a flat slab. Which access equipment fits best?
Correct Answer
D) scissor lift
scissor lift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
scissor lift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: articulating boom lift
articulating boom lift puts the item in the wrong financial bucket, timing, base, or comparison for scissor lift access.
Option B: mast-climbing work platform
mast-climbing work platform puts the item in the wrong financial bucket, timing, base, or comparison for scissor lift access.
Option C: mobile scaffold tower
mobile scaffold tower puts the item in the wrong financial bucket, timing, base, or comparison for scissor lift access.
Memory Technique
Financial Classification ledger for Foreman Selecting: put controlling in the right drawer.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tools and equipment; aerial lift selection by access need; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
At the hotel pool-equipment yard, during the next-week procurement cycle, a ride-on sweeper is needed for warehouse turnover cleaning for 14 days at $225 per day, plus a $145 delivery charge. What rental cost should be budgeted?
Next Question
For the subcontractor quantity check at the retail demising-wall phase, the wrapped panel area for acoustic wall fabric is 2655 SF and the order includes 0% waste. How many square yards are required?