From the dumpster pad plan, what perimeter length is needed for edge forming?
Correct Answer
C) 92 ft
The pad perimeter is 2 x (28 ft + 18 ft) = 92 ft.
Why This Is the Correct Answer
The pad perimeter is 2 x (28 ft + 18 ft) = 92 ft.
Why the Other Options Are Wrong
Option A: 74 ft
74 ft is below the supported result for slab perimeter takeoff; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 84 ft
84 ft is below the supported result for slab perimeter takeoff; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 96 ft
96 ft is above the supported result for slab perimeter takeoff; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Slab Perimeter Takeoff cart for Site Package: pad first, reading second, whole ft last.
Reference Hint
Open-book path: turn to sheet A-125 in the plan packet, then use the DUMPSTER PAD PLAN note/table before checking P&P Commercial Construction plan-reading guidance.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?