The point of beginning in a metes and bounds description must be:
Correct Answer
A) A definite, identifiable point that the description returns to
The point of beginning is the identified starting reference for the described boundary, with boundary calls returning to it in a closed parcel description. It need not be the northeast corner, nearest road or main building. Any apparent inconsistency should be investigated through appropriate survey/title information rather than an appraiser declaring title invalid solely from a shortcut.
Why This Is the Correct Answer
Option A is correct because the point of beginning must be a definite, identifiable starting reference that the description returns to. A metes and bounds description starts at the point of beginning and traces the boundary all the way around back to it. Without a clear starting point and closure, the parcel cannot be reliably located.
Why the Other Options Are Wrong
Option B: The northeast corner of the parcel being described in the deed
Option B says it must be the northeast corner of the parcel. The point of beginning can be any identifiable point; no rule requires the northeast corner. Section 1 starting at the northeast corner belongs to the rectangular survey system, not metes and bounds.
Option C: The centerline of the nearest public road
Option C says it must be the centerline of the nearest public road. A road may sometimes help locate a point, but metes and bounds does not require the point of beginning to be a road centerline.
Option D: The location of the property's main improvement
Option D says it must be the location of the main improvement. Buildings can be moved or removed, and the description traces land boundaries, so the point of beginning is not tied to the improvement.
Start here, end here
A metes and bounds description is a loop: it leaves the point of beginning and must come back to it to close.
How to use: Use this when a question asks what the point of beginning must be.
Exam Tip
Choose the answer about an identifiable point that the description returns to; options tying it to a specific corner, road or building are usually distractors.
Common Mistakes to Avoid
- -Thinking the point of beginning must be the northeast corner
- -Mixing up metes and bounds with rectangular survey numbering
- -Assuming a building location can serve as the boundary reference
Concept Deep Dive
Analysis
This question tests the role of the point of beginning in a metes and bounds description. The description starts at an identifiable point, traces each boundary call around the parcel, and returns to that same point to close. The point does not have to be a particular corner, road or building.
Background Knowledge
Metes and bounds describes land by measured distances (metes) and directions or boundaries (bounds), beginning and ending at the point of beginning. It is one of the main legal description methods in the United States, along with the rectangular survey system and lot and block. Appraisers use the legal description to identify the property but rely on surveyors and title professionals to resolve boundary problems.
Real-World Application
An appraiser reviewing a rural deed sees a description starting at an iron pin at a fence corner and tracing several calls around the tract. The final call does not appear to reach the starting pin. The appraiser notes the possible discrepancy and recommends survey or title review rather than declaring the description invalid.
More Property Description Questions
A local zoning ordinance allows these maximum densities: R-1, 4 units per acre; R-2, 8 units per acre; R-4, 20 units per acre; PUD (with approval), 12 units per acre. Which category allows the highest density?
What design advantage is commonly associated with post-and-beam construction?
A hypothetical local ordinance permits either a single-family house or duplex on the site. The existing single-family house complies with all current rules. Which statement is supported?
A zoning variance allowing a reduced side setback is granted for a parcel. After the parcel is sold, who generally holds the benefit of the variance, subject to its conditions?
Under ANSI Z765-2021 as applied by Fannie Mae, a staircase runs from the second floor down to the first floor. Its area is counted as part of:
Under ANSI Z765-2021, as Fannie Mae requires for a detached house, where are exterior dimensions taken on a brick-veneer wall?
A building's HVAC system would be classified as which type of building component?
A home on a large tract is valued at $620,000 including the land it needs. The remaining excess land could be sold separately and contributes a net $95,000 after separation costs. What is the total indicated value?
A covered sale concerns a residence built in 1965. Which hazard is the subject of the federal pre 1978 housing disclosure rule, without assuming its actual presence?
Which site characteristic is most likely to reduce site utility by restricting where a typical dwelling can be placed?
People Also Study
Real Estate Market
13.6% of exam
Land or Site Valuation
4.5% of exam
Sales Comparison Approach
16.4% of exam
Cost Approach
13.6% of exam
Income Approach
8.2% of exam
Previous Question
For a covered Fannie Mae appraisal under the cited measurement FAQ, which pair of sketch and final-area reporting conventions is correct?
Next Question
A parcel of land is subject to a recorded judgment lien filed three years ago for $75,000 against the current owner. The lien remains unsatisfied and unexpired under state law. The owner lists the property for sale 'subject to all liens and encumbrances.' In preparing an appraisal for a prospective buyer, what is the appraiser’s obligation regarding this lien?