Cost ApproachEASY13.6% of exam

Which cost component represents a supported anticipated reward for development coordination and risk, distinct from contractor overhead/profit?

Correct Answer

B) Entrepreneurial incentive.

The terminology in this question calls the market-supported anticipated development reward entrepreneurial incentive. It is distinct from contractor overhead/profit and direct materials. Realized entrepreneurial profit is an outcome that may inform the estimate, rather than automatically the prospective cost input.

Answer Options
A
Direct material cost.
B
Entrepreneurial incentive.
C
Accrued physical deterioration.
D
A property-tax appeal charge.

Why This Is the Correct Answer

Option B is correct because entrepreneurial incentive is the market-supported anticipated reward for coordinating development and bearing its risk. It is distinct from contractor overhead and profit, which is a direct cost. Realized entrepreneurial profit may inform the estimate, but the prospective cost input is the anticipated incentive.

Why the Other Options Are Wrong

Option A: Direct material cost.

Option A, direct material cost, is a direct construction cost for physical inputs. It is not a reward for the developer's coordination and risk.

Option C: Accrued physical deterioration.

Option C, accrued physical deterioration, is a form of depreciation subtracted from cost new. It is a loss in value, not a cost component that rewards development.

Option D: A property-tax appeal charge.

Option D, a property-tax appeal charge, is unrelated to development cost. It does not represent a reward for coordinating construction and bearing risk.

Contractor builds, entrepreneur risks

The contractor's profit pays for building; the entrepreneur's incentive pays for organizing the project and bearing the risk.

How to use: Use this to separate contractor overhead and profit from entrepreneurial incentive.

Exam Tip

Incentive is the anticipated reward before the project; profit is what was actually earned afterward. Watch for questions that test that distinction.

Common Mistakes to Avoid

  • -Treating contractor overhead and profit as entrepreneurial incentive
  • -Leaving entrepreneurial incentive out of total cost when the market supports it
  • -Confusing anticipated incentive with realized profit

Concept Deep Dive

Analysis

This question tests cost terminology. It asks for the cost component that rewards the developer for coordination and risk, which is separate from the contractor's overhead and profit. The reasoning is to match the description to entrepreneurial incentive.

Background Knowledge

Total development cost includes direct costs, indirect costs and an allowance for the developer's reward. Entrepreneurial incentive is the anticipated amount a developer expects to receive for organizing the project and taking on risk, and it is distinguished from the contractor's overhead and profit.

Real-World Application

When estimating replacement cost for a new subdivision home, an appraiser adds an allowance for entrepreneurial incentive supported by what local builders typically expect to earn. That allowance is separate from the general contractor's overhead and profit already in the cost estimate.

entrepreneurial incentiveentrepreneurial profitcontractor overhead and profitdevelopment costcost approach
Was this explanation helpful?

More Cost Approach Questions

Why can equivalent-utility replacement cost be useful for an obsolete improvement?

An appraiser estimates the current replacement cost new of the improvements at $890,000, accrued depreciation from all causes at $170,000, and land value at $325,000. All necessary cost components and depreciation are included in those amounts. What is the indicated property value?

Improvement cost new is $595,000. Separately supported improvement depreciation deductions of $48,000, $27,000 are expressly nonoverlapping and not already excluded from cost new. Add supported site value of $155,000, already reflecting any site losses. What total indicated value results?

What best supports a claimed loss from a bathroom-layout deficiency?

Improvement cost new is $1,850,000. Separately supported improvement depreciation deductions of $310,000, $620,000 are expressly nonoverlapping and not already excluded from cost new. No site is included. What depreciated improvement amount results?

Which scenario most strongly supports giving the cost approach substantial weight?

A cost total $650,000 explicitly includes $40,000 of non-realty FF&E outside the appraised real-property interest. Exclude it. Supported realty-only total depreciation is $55,000. Add site $200,000, with no overlap. What real-property cost indication results?

A 2,200-sf dwelling costs $200 per square foot, and a separate 400-sf garage costs $75 per square foot. These costs are complete and do not overlap. Both have an effective age of 15 years and a total life of 50 years, with straight-line depreciation and no salvage value. No site value or other loss is involved. What is the combined depreciated cost of the dwelling and garage?

A new feature in the improvements has a current cost of $45,000 and a market contribution of $18,000. The entire difference is due to superadequacy, with no physical or external loss and no overlap. What is the loss from the superadequacy?

An external influence causes an annual net income loss of $9,600. The capitalization rate for the loss is 8%, and no other economic factors change. What is the indicated loss in value of the whole property, before allocation between site and improvements?