Direct and indirect improvement costs including contractor overhead/profit total $475,000, explicitly excluding entrepreneurial incentive. Separate supported incentive is 12% of that base. What full improvement cost new results?
Correct Answer
C) $532,000
475000×1.12 = 532000. Common errors: leaving out the entrepreneurial incentive gives $475,000; reporting only the incentive gives $57,000; grossing up by dividing by 0.88 instead of adding 12% of the base gives $539,773.
Why This Is the Correct Answer
Option C is correct because full improvement cost new includes direct and indirect costs plus a market-supported entrepreneurial incentive. The incentive is 12% of $475,000, or $57,000, so the total is $475,000 × 1.12 = $532,000.
Why the Other Options Are Wrong
Option A: $57,000
Option A, $57,000, reports only the incentive: $475,000 × 0.12 = $57,000. The question asks for full cost new, which is $475,000 + $57,000 = $532,000.
Option B: $475,000
Option B, $475,000, leaves out the entrepreneurial incentive. The base explicitly excludes it, so the 12% must be added: $475,000 × 1.12 = $532,000.
Option D: $539,773
Option D, $539,773, grosses up by dividing by 0.88: $475,000 ÷ 0.88 = $539,773. The stem states the incentive as 12% of the base, so the result is $475,000 × 1.12 = $532,000.
Contractor Profit Isn't Developer Incentive
Contractor profit is part of the building cost; the developer's incentive is a separate layer added on top.
How to use: Use this to avoid omitting incentive when a base already includes contractor profit.
Exam Tip
If the cost base explicitly excludes entrepreneurial incentive, add it at the stated rate on that base.
Common Mistakes to Avoid
- -Treating contractor profit as entrepreneurial incentive
- -Grossing up when the rate is stated on the base
- -Reporting the incentive alone as the answer
Concept Deep Dive
Analysis
This question tests adding entrepreneurial incentive to a cost base that already includes contractor overhead and profit. The incentive is separate from the contractor's profit and is stated as 12% of the base, so it is added on top of that base.
Background Knowledge
Contractor overhead and profit is an indirect cost of construction, while entrepreneurial incentive is the developer's reward for risk and coordination. Full economic cost includes all direct and indirect costs plus market-supportable entrepreneurial profit. The two profit items are separate and both may belong in cost new.
Real-World Application
A cost service shows $475,000 in direct and indirect costs including the builder's overhead and profit. Interviews with local developers support a 12% incentive, so the appraiser reports $532,000 as full cost new.
More Cost Approach Questions
Why can equivalent-utility replacement cost be useful for an obsolete improvement?
An appraiser estimates the current replacement cost new of the improvements at $890,000, accrued depreciation from all causes at $170,000, and land value at $325,000. All necessary cost components and depreciation are included in those amounts. What is the indicated property value?
Improvement cost new is $595,000. Separately supported improvement depreciation deductions of $48,000, $27,000 are expressly nonoverlapping and not already excluded from cost new. Add supported site value of $155,000, already reflecting any site losses. What total indicated value results?
What best supports a claimed loss from a bathroom-layout deficiency?
Improvement cost new is $1,850,000. Separately supported improvement depreciation deductions of $310,000, $620,000 are expressly nonoverlapping and not already excluded from cost new. No site is included. What depreciated improvement amount results?
Which scenario most strongly supports giving the cost approach substantial weight?
A cost total $650,000 explicitly includes $40,000 of non-realty FF&E outside the appraised real-property interest. Exclude it. Supported realty-only total depreciation is $55,000. Add site $200,000, with no overlap. What real-property cost indication results?
A 2,200-sf dwelling costs $200 per square foot, and a separate 400-sf garage costs $75 per square foot. These costs are complete and do not overlap. Both have an effective age of 15 years and a total life of 50 years, with straight-line depreciation and no salvage value. No site value or other loss is involved. What is the combined depreciated cost of the dwelling and garage?
A new feature in the improvements has a current cost of $45,000 and a market contribution of $18,000. The entire difference is due to superadequacy, with no physical or external loss and no overlap. What is the loss from the superadequacy?
An external influence causes an annual net income loss of $9,600. The capitalization rate for the loss is 8%, and no other economic factors change. What is the indicated loss in value of the whole property, before allocation between site and improvements?
People Also Study
Real Estate Market
13.6% of exam
Property Description
11.8% of exam
Land or Site Valuation
4.5% of exam
Sales Comparison Approach
16.4% of exam
Income Approach
8.2% of exam
Previous Question
An improvement had a historical cost of $210,000. A suitable cost index for the same construction scope was 105 at that time and is 210 today. What is the trended current cost?
Next Question
A functional defect is economically incurable under a verified cost-benefit analysis. What supports its depreciation allowance?
