Direct improvement costs are $430,000. Additional soft costs are 12% of direct, and separate entrepreneurial incentive is $38,400. None overlap. Supported total improvement depreciation $110,000 applies to the complete cost. Add site $200,000. What total indication results?
Correct Answer
D) $610,000
430000×1.12+38400−110000+200000 = 610000. Common errors: leaving out the site value gives $410,000; leaving out the entrepreneurial incentive gives $571,600; leaving out the 12% soft costs gives $558,400.
Why This Is the Correct Answer
Option D is correct because soft costs are $430,000 × 12% = $51,600, so full cost new is $430,000 + $51,600 + $38,400 = $520,000. Deducting $110,000 of depreciation and adding $200,000 of site gives $520,000 − $110,000 + $200,000 = $610,000. Full economic cost includes direct and indirect costs plus market-supportable entrepreneurial profit.
Why the Other Options Are Wrong
Option A: $410,000
Option A is wrong because $410,000 is $430,000 × 1.12 + $38,400 − $110,000, which leaves out the $200,000 site value. Adding the site gives $610,000.
Option B: $558,400
Option B is wrong because $558,400 is $430,000 + $38,400 − $110,000 + $200,000, which leaves out the 12% soft costs of $51,600. Including them gives $610,000.
Option C: $571,600
Option C is wrong because $571,600 is $430,000 × 1.12 − $110,000 + $200,000, which leaves out the $38,400 entrepreneurial incentive. Including it gives $610,000.
Hard, soft, incentive, then subtract
Build cost new from hard costs, soft costs and incentive first, then subtract depreciation and add site.
How to use: Use this order to make sure each cost component is included before you deduct depreciation.
Exam Tip
When soft costs are given as a percentage, compute them on the base the stem names, here direct costs, before adding the separate incentive.
Common Mistakes to Avoid
- -Leaving entrepreneurial incentive out of cost new
- -Forgetting to add soft costs calculated as a percentage of direct costs
- -Omitting the site value from the final indication
Concept Deep Dive
Analysis
This question tests building up full cost new from direct costs, soft costs and entrepreneurial incentive before deducting depreciation and adding site. Soft costs are a percentage of direct costs, and the incentive is a separate dollar amount. The stated depreciation applies to the complete cost, so it is subtracted after the full buildup.
Background Knowledge
Full economic cost new includes direct (hard) costs, indirect (soft) costs such as fees and financing, and a market-supported entrepreneurial incentive or profit. Depreciation is then deducted from the complete cost new, and site value is added to reach the cost approach indication. Omitting any component understates cost new.
Real-World Application
An appraiser developing a cost approach for a newer custom home obtains the builder's direct costs, adds architectural, permit and financing costs, and includes a market-supported developer incentive. After deducting supported depreciation, the appraiser adds the site value from recent lot sales.
More Cost Approach Questions
Why can equivalent-utility replacement cost be useful for an obsolete improvement?
An appraiser estimates the current replacement cost new of the improvements at $890,000, accrued depreciation from all causes at $170,000, and land value at $325,000. All necessary cost components and depreciation are included in those amounts. What is the indicated property value?
Improvement cost new is $595,000. Separately supported improvement depreciation deductions of $48,000, $27,000 are expressly nonoverlapping and not already excluded from cost new. Add supported site value of $155,000, already reflecting any site losses. What total indicated value results?
What best supports a claimed loss from a bathroom-layout deficiency?
Improvement cost new is $1,850,000. Separately supported improvement depreciation deductions of $310,000, $620,000 are expressly nonoverlapping and not already excluded from cost new. No site is included. What depreciated improvement amount results?
Which scenario most strongly supports giving the cost approach substantial weight?
A cost total $650,000 explicitly includes $40,000 of non-realty FF&E outside the appraised real-property interest. Exclude it. Supported realty-only total depreciation is $55,000. Add site $200,000, with no overlap. What real-property cost indication results?
A 2,200-sf dwelling costs $200 per square foot, and a separate 400-sf garage costs $75 per square foot. These costs are complete and do not overlap. Both have an effective age of 15 years and a total life of 50 years, with straight-line depreciation and no salvage value. No site value or other loss is involved. What is the combined depreciated cost of the dwelling and garage?
A new feature in the improvements has a current cost of $45,000 and a market contribution of $18,000. The entire difference is due to superadequacy, with no physical or external loss and no overlap. What is the loss from the superadequacy?
An external influence causes an annual net income loss of $9,600. The capitalization rate for the loss is 8%, and no other economic factors change. What is the indicated loss in value of the whole property, before allocation between site and improvements?
People Also Study
Real Estate Market
13.6% of exam
Property Description
11.8% of exam
Land or Site Valuation
4.5% of exam
Sales Comparison Approach
16.4% of exam
Income Approach
8.2% of exam
