A claim is not resolved informally and the contract names an Initial Decision Maker. What happens next under AIA A201?
Correct Answer
B) The claim is submitted for an initial decision under the contract process
A201 routes covered claims through the Initial Decision Maker process.
Why This Is the Correct Answer
A201 routes covered claims through the Initial Decision Maker process.
Why the Other Options Are Wrong
Option A: The claim is automatically paid in the next application without review
The claim is automatically paid in the next application without review may relate to another site control, but it does not remove or guard the initial decision exposure being tested.
Option C: The bid security is forfeited to resolve the construction dispute, and use that shortcut to decide the claim decision initial requirement, without requesting a written interpretation from the architect
The bid security is forfeited to resolve the construction dispute, and use that shortcut to decide the claim decision initial requirement, without requesting a written interpretation from the architect may relate to another site control, but it does not remove or guard the initial decision exposure being tested.
Option D: The subcontractor supplier becomes the final dispute tribunal, while treating the supplier quote as the controlling document
The subcontractor supplier becomes the final dispute tribunal, while treating the supplier quote as the controlling document may relate to another site control, but it does not remove or guard the initial decision exposure being tested.
Memory Technique
If Team Follows can still reach the worker, the control is decoration.
Reference Hint
Open-book path: tab AIA A201-2017 to Article 15, Β§15.2 Initial Decision; match the contract role, notice step, and timing in the stem before choosing.
More Contract Admin Questions
An owner assumes the architect's site visit means the architect is supervising the contractor's crews. What AIA A201 concept corrects that assumption?
The GC and owner disagree about what a specification requires. Under AIA A201, who commonly provides interpretations and decisions during administration?
The architect observes work that does not conform to the Contract Documents. Which AIA A201 architect authority may apply?
A subcontractor says the prime contract general conditions do not apply to its work. Under AIA A401, what should the GC point to?
An addendum adds 18 access panels at $315 each installed. What amount should be added to the bid?
A slab-on-grade is 96 ft by 54 ft and 5 in thick. Including 7% waste, how many cubic yards of concrete should be carried?
An addendum adds 14 doors at $685 each installed. What additive amount should be added to the bid for those doors?
A CMU wall area is 2,240 sf after openings. If one block covers 1.125 sf and 4% waste is included, how many blocks should be estimated?
An office ceiling takeoff is 11,250 sf. Ceiling tile waste is 6%. How many square feet of tile should be carried?
A framing crew averages 310 lf of partition layout and track per day. The bid includes 2,170 lf. At $1,540 per crew day, what labor amount should be carried?