A field change alters a fire-rated wall shown on approved drawings. What should happen?
Correct Answer
D) Route approved revision
FBC administration requires approved documents or approved revisions.
Why This Is the Correct Answer
FBC administration requires approved documents or approved revisions.
Why the Other Options Are Wrong
Option A: Build from the sketch and mention it later
Build from the sketch and mention it later may relate to another site control, but it does not remove or guard the approved revision exposure being tested.
Option B: Use supplier data as permit approval
Use supplier data as permit approval may relate to another site control, but it does not remove or guard the approved revision exposure being tested.
Option C: Let the foreman approve the rating
Let the foreman approve the rating may relate to another site control, but it does not remove or guard the approved revision exposure being tested.
Memory Technique
If Renovation Changes can still reach the worker, the control is decoration.
Reference Hint
Open-book path: tab Florida Building Code, Building, 8th Edition (2023), Chapter 1 Administration to Chapter 1 Section 107 construction documents; check the math, FL authority, inspection point, or field record before choosing.
More Contract Admin Questions
An owner assumes the architect's site visit means the architect is supervising the contractor's crews. What AIA A201 concept corrects that assumption?
The GC and owner disagree about what a specification requires. Under AIA A201, who commonly provides interpretations and decisions during administration?
The architect observes work that does not conform to the Contract Documents. Which AIA A201 architect authority may apply?
A subcontractor says the prime contract general conditions do not apply to its work. Under AIA A401, what should the GC point to?
An addendum adds 18 access panels at $315 each installed. What amount should be added to the bid?
A slab-on-grade is 96 ft by 54 ft and 5 in thick. Including 7% waste, how many cubic yards of concrete should be carried?
An addendum adds 14 doors at $685 each installed. What additive amount should be added to the bid for those doors?
A CMU wall area is 2,240 sf after openings. If one block covers 1.125 sf and 4% waste is included, how many blocks should be estimated?
An office ceiling takeoff is 11,250 sf. Ceiling tile waste is 6%. How many square feet of tile should be carried?
A framing crew averages 310 lf of partition layout and track per day. The bid includes 2,170 lf. At $1,540 per crew day, what labor amount should be carried?