A permit application lists a contracting business but the qualifying agent is not tied to that business. What should be verified?
Correct Answer
A) Business organization and qualifying-agent authority
Chapter 489 addresses business organizations and qualifying agents for construction contracting.
Why This Is the Correct Answer
Chapter 489 addresses business organizations and qualifying agents for construction contracting.
Why the Other Options Are Wrong
Option B: Whether the supplier quote uses the same project nickname
Whether the supplier quote uses the same project nickname skips the written authority, scope, price, notice, or release control needed for permit qualifier.
Option C: Whether the estimator included enough tax allowance
Whether the estimator included enough tax allowance skips the written authority, scope, price, notice, or release control needed for permit qualifier.
Option D: Whether the punch list is shorter than the closeout log
Whether the punch list is shorter than the closeout log skips the written authority, scope, price, notice, or release control needed for permit qualifier.
Memory Technique
Coordinator Checks shortcut is not a term until paper carries it.
Reference Hint
Open-book path: tab Florida Statutes Chapter 489 to Sections 489.119 and 489.1195 business organizations and responsibilities; verify the quantity, approval point, notice rule, or field record before answering.
More Contract Admin Questions
An owner assumes the architect's site visit means the architect is supervising the contractor's crews. What AIA A201 concept corrects that assumption?
The GC and owner disagree about what a specification requires. Under AIA A201, who commonly provides interpretations and decisions during administration?
The architect observes work that does not conform to the Contract Documents. Which AIA A201 architect authority may apply?
A subcontractor says the prime contract general conditions do not apply to its work. Under AIA A401, what should the GC point to?
An addendum adds 18 access panels at $315 each installed. What amount should be added to the bid?
A slab-on-grade is 96 ft by 54 ft and 5 in thick. Including 7% waste, how many cubic yards of concrete should be carried?
An addendum adds 14 doors at $685 each installed. What additive amount should be added to the bid for those doors?
A CMU wall area is 2,240 sf after openings. If one block covers 1.125 sf and 4% waste is included, how many blocks should be estimated?
An office ceiling takeoff is 11,250 sf. Ceiling tile waste is 6%. How many square feet of tile should be carried?
A framing crew averages 310 lf of partition layout and track per day. The bid includes 2,170 lf. At $1,540 per crew day, what labor amount should be carried?