Correct Answer
B) 2021 Oregon Residential Specialty Code
Oregon currently adopts the 2021 Oregon Residential Specialty Code (ORSC) based on the 2021 IRC with Oregon amendments.
Why This Is the Correct Answer
Oregon adopted the 2021 Oregon Residential Specialty Code (ORSC), which is based on the 2021 International Residential Code (IRC) with Oregon-specific amendments. This edition is administered by the Oregon Building Codes Division and applies statewide to residential construction.
Why the Other Options Are Wrong
Option A: 2017 Oregon Residential Specialty Code
The 2017 Oregon Residential Specialty Code was a previous edition and has been superseded by the 2021 ORSC. Using an outdated code edition can lead to non-compliant construction and failed inspections.
Option C: 2023 Oregon Residential Specialty Code
The 2023 Oregon Residential Specialty Code does not exist as a currently adopted edition. Oregon's code adoption cycle follows the IRC update cycle with a lag for state rulemaking; 2021 is the current edition as of the exam date.
Option D: 2019 Oregon Residential Specialty Code
There was no 2019 Oregon Residential Specialty Code edition adopted statewide. Oregon moved from the 2014 ORSC to the 2021 ORSC, skipping the 2019 IRC cycle.
Memory Technique
Oregon 2021 ORSC: remember '21 for 21st-century Oregon.' The IRC and ORSC share the 2021 vintage β both codes updated together. If you know the 2021 IRC is current at the federal/model level, Oregon mirrors it.
More Oregon Questions
Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?
An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?
A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?
Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?
A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?
A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.
A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?
What is the minimum experience requirement for obtaining an Oregon CCB contractor license?
A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?
A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?