Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?

Correct Answer

C) $200,000

ORS 701 requires CCB licensed contractors to maintain minimum public liability insurance of $200,000.

Answer Options
A
$100,000
B
$25,000
C
$200,000
D
$50,000

Why This Is the Correct Answer

Under Oregon Revised Statutes (ORS) 701, the Construction Contractors Board (CCB) requires all licensed contractors to maintain a minimum of $200,000 in public liability insurance coverage. This requirement ensures adequate protection for the public and property owners in case of accidents, injuries, or property damage that may occur during construction work. The $200,000 minimum is specifically mandated by state law and is a prerequisite for maintaining an active CCB license.

Why the Other Options Are Wrong

Option B: $25,000

$25,000 is significantly below the statutory requirement under ORS 701. This amount would provide insufficient coverage for potential liability claims in construction work and does not meet the legal minimum established by the Oregon Construction Contractors Board for licensed contractors.

Option D: $50,000

$50,000 falls well short of the required minimum public liability insurance coverage mandated by ORS 701. While this might seem like substantial coverage, it is only one-quarter of the actual legal requirement for CCB licensed contractors in Oregon.

Memory Technique

Remember 'Oregon CCB = 200K' - think 'Two Hundred for Construction Coverage in Oregon' or visualize two $100 bills stacked to represent the $200,000 minimum requirement.

Was this explanation helpful?

More or-supplement Questions

An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?

A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?

Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?

A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?

A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.

A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?

What is the minimum experience requirement for obtaining an Oregon CCB contractor license?

A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?

A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?

Under Oregon residential contractor requirements, what is the minimum bond amount required for a CCB license?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.