A contractor renovates a kitchen in a home built in 1965. The project cost is $15,000. What lead-safe work practice is required?
Correct Answer
A) EPA RRP certification and containment
All renovation work in pre-1978 homes requires EPA RRP certification and lead-safe work practices regardless of project cost.
Why This Is the Correct Answer
Option A is correct. Any renovation work in a pre-1978 home requires EPA RRP certification and lead-safe containment practices, regardless of project cost or scope. The 1965 construction date places this home squarely within the pre-1978 category where lead-based paint was commonly used.
Why the Other Options Are Wrong
Option B: Lead testing only if requested by homeowner
Option B is wrong. Lead testing at homeowner request is not a substitute for required RRP certification and lead-safe practices. The EPA RRP rule is triggered by the age of the home (pre-1978), not by whether the homeowner requests testing.
Option C: No special requirements for projects under $20,000
Option C is wrong. There is no project cost exemption under EPA RRP rules. A $15,000 project in a pre-1978 home is fully subject to RRP requirements. Cost thresholds are not a factor in determining lead-safe work practice requirements.
Option D: Warning signs posted outside the home
Option D is wrong. Posting warning signs alone does not satisfy EPA RRP requirements. The full protocol includes firm certification, worker training, lead-safe work practices, and proper containment and cleanup β not just signage.
Memory Technique
Pre-1978 = always RRP. Think of it as a hard rule with no exceptions based on cost, project size, or homeowner preference. '78 or earlier, lead safety is required β no matter the dollar amount.'
More Oregon Questions
Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?
An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?
A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?
Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?
A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?
A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.
A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?
What is the minimum experience requirement for obtaining an Oregon CCB contractor license?
A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?
A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?