Temporary braces are removed from a long wall before roof framing or permanent bracing ties it into the structure. What is the risk?

Correct Answer

D) Instability.

Temporary bracing should remain until the permanent framing system provides stability.

Answer Options
A
Continue framing where temporary braces are removed from a long wall before roof framing or permanent bracing ties it into the structure, and leave the structural correction for a later trade.
B
Photograph the condition where temporary braces are removed from a long wall before roof framing or permanent bracing ties it into the structure, but close the framing item without rebuilding the load path before cover.
C
Treat the item as layout cleanup where temporary braces are removed from a long wall before roof framing or permanent bracing ties it into the structure, and postpone the structural correction until after cover.
D
Instability.

Why This Is the Correct Answer

Temporary bracing should remain until the permanent framing system provides stability.

Was this explanation helpful?

More ca-trade-b Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.