A refrigeration maintenance procedure requires a verified leak test after a repaired joint and before return to service. The repair is complete but the test has not been performed. What remains necessary under the procedure?
- Perform and document the required leak test.
- BReturn to service because the joint looks clean.
- CSkip the test if the repair took less than an hour.
- DReplace the test record with an annual calendar reminder.
Where to look it up
Explicit exercise assumptions; not a universal code requirement.
Why A is correct
A completed physical repair does not satisfy the separate verification step. The stated procedure supplies the obligation; no unsupported IMC maintenance list is implied.
