Annual escrow disbursements on a file come to $7,200 for taxes and insurance together. The servicer wants to hold the largest cushion RESPA allows. Assuming neither state law nor the mortgage documents impose a lower limit, what is the maximum permitted escrow cushion?
Correct Answer
D) $1,200: the cushion may not exceed 1/6 of annual disbursements
D. The maximum permitted cushion is $1,200. Apply the one-sixth ceiling to the $7,200 estimated annual disbursements: $7,200 ÷ 6 = $1,200. Ordinary monthly escrow is $600, making this two months of escrow rather than two full loan payments. Scope and exceptions: A cushion is not mandatory, and a lower legal or contractual limit would control. The cushion calculation alone does not establish the initial deposit or every monthly target balance; aggregate escrow analysis remains necessary. Source: Section 1024.17(c)(1)(ii), (5), (8) and (d)(1) — https://www.consumerfinance.gov/rules-policy/regulations/1024/17/
Why This Is the Correct Answer
D. The maximum permitted cushion is $1,200. Apply the one-sixth ceiling to the $7,200 estimated annual disbursements: $7,200 ÷ 6 = $1,200. Ordinary monthly escrow is $600, making this two months of escrow rather than two full loan payments. Scope and exceptions: A cushion is not mandatory, and a lower legal or contractual limit would control. The cushion calculation alone does not establish the initial deposit or every monthly target balance; aggregate escrow analysis remains necessary.
Why the Other Options Are Wrong
Option A: $600: the cushion is capped at 1 month of escrow payments
One month is a permissible smaller cushion, not the maximum.
Option B: $2,400: the cushion may run to 1/3 of the annual disbursements
One-third doubles the permitted ceiling.
Option C: $1,800: a servicer may hold up to 3 months of the escrow payments
Three months exceeds the two-month equivalent.
Exam Tip
The ceiling is one-sixth of annual escrow disbursements, not annual mortgage payments.
More Origination Questions
Before the team acts on a servicing handoff check, a closing coordinator must address Asset Verification and Reserves. Which response is most defensible?
An MLO is reviewing procedures for a case where a cost changes after the Closing Disclosure has already been provided. What is the proper handling?
During a post-application update, a quality-control reviewer encounters a Credit Analysis and Evaluation issue. Which response should avoid a shortcut that would misapply the rule?
A construction-to-permanent loan will disburse in 5 draws over 11 months before the permanent phase begins. Which Regulation Z appendix provides a disclosure method for multiple-advance construction transactions?
Before closing, the team discovers that a borrower asks which upfront charge can be collected before intent to proceed. What is the safest compliant answer?
A construction loan agreement allows advances only after documented completion of specified work. A builder requests the next draw, but no completion evidence has been provided. What should occur?
Before releasing the final construction draw, which combination most directly supports project completion and clear collateral?
A construction-to-permanent loan will convert to a substantially higher fully amortizing payment. Which payment is especially important when assessing the borrower's long-term repayment capacity?
A construction-to-permanent note states that conversion requires completion, a certificate of occupancy, and no unresolved liens. Construction is finished, but a mechanic's lien remains. What should happen?
A branch manager asks about a loan file because a processor wants to omit known monthly obligations from underwriting. What should happen?
People Also Study
Federal Mortgage-Related Laws
24% of exam
General Mortgage Knowledge
20% of exam
Ethics, Fraud & Consumer Protection
18% of exam
Uniform State Test Content
11% of exam
Related Study Resources
Previous Question
In a closing-readiness check, a disclosure specialist sees facts tied to Private Mortgage Insurance. What should the file reflect?
Next Question
A project is 60% complete, but 85% of the construction budget has already been advanced. What should the lender review before approving another draw?
