← Contractor exam prep

Contractor exam labs

Work the contractor math in 3D

Predict a takeoff or a price, test it on a live model, apply it to a new job, then answer a verified exam question. Estimating, business math and electrical calculations. The first three labs are free.

A crew finishing a freshly poured concrete slab on a job siteFree lab · Concrete for a slab

Estimating & quantities

Thicken a slab inch by inch and see why the inches must become feet before you divide by 27.
Free lab

Concrete for a slab

Thicken a slab inch by inch and see why the inches must become feet before you divide by 27.

Stack joists one at a time and keep the divide-by-12 that turns inches and feet into board feet.
Free lab

Board feet in a lumber order

Stack joists one at a time and keep the divide-by-12 that turns inches and feet into board feet.

Business & finance

Raise the markup on a fixed cost and see the margin on the same price stay smaller.
EstatePass Pro

Markup versus margin

Raise the markup on a fixed cost and see the margin on the same price stay smaller.

Pay down current liabilities and watch current assets cover them more times over.
EstatePass Pro

The current ratio

Pay down current liabilities and watch current assets cover them more times over.

Stock up on inventory and see why the quick ratio doesn’t move while the current ratio does.
EstatePass Pro

The quick ratio

Stock up on inventory and see why the quick ratio doesn’t move while the current ratio does.

Change current liabilities and read working capital as dollars left over, not a ratio.
EstatePass Pro

Working capital

Change current liabilities and read working capital as dollars left over, not a ratio.

Raise a finished job’s billed price and measure the profit against the price, then against the cost.
EstatePass Pro

Gross margin on a finished job

Raise a finished job’s billed price and measure the profit against the price, then against the cost.

Field & electrical math

Turn up a heater’s wattage on a 120-volt circuit and follow the current it draws.
EstatePass Pro

Watts, volts and amps

Turn up a heater’s wattage on a 120-volt circuit and follow the current it draws.

Lengthen a branch circuit and see the drop the conductors take out before the load.
EstatePass Pro

Voltage drop on a long run

Lengthen a branch circuit and see the drop the conductors take out before the load.

Size a breaker for a continuous load and see where the 80% ceiling sits.
EstatePass Pro

Continuous loads at 80%

Size a breaker for a continuous load and see where the 80% ceiling sits.

Change the current a 120-volt load draws and find the resistance that sets it.
EstatePass Pro

Ohm’s law: resistance

Change the current a 120-volt load draws and find the resistance that sets it.

Load a 240-volt circuit amp by amp and multiply, rather than divide, to get the watts.
EstatePass Pro

Power from volts and amps

Load a 240-volt circuit amp by amp and multiply, rather than divide, to get the watts.

Pull conductors into a conduit until the next one would cross the 40% fill limit.
EstatePass Pro

Conduit fill at 40%

Pull conductors into a conduit until the next one would cross the 40% fill limit.

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.