EstatePass
Originationmedium27% of exam

A pull fails on 3 June 2026 because the borrower froze all 3 bureau files after an identity theft last year. What action is needed to permit the lender's new-credit report request while the consumer's files are frozen?

Correct Answer

A) The borrower requests a temporary lift or removal at the bureaus needed for the new-credit pull

A. Arrange the relevant freeze lift before retrying the blocked request. A security freeze restricts prospective creditors from accessing the file. The consumer can lift it temporarily without abandoning the protection permanently. Scope and exceptions: A freeze does not prevent every kind of access: existing creditors and specified entities have exceptions, and consumers can inspect their own files. Coordinate the necessary bureaus and access period. This answer does not determine whether a personal copy meets a particular underwriting standard. Source: Access exceptions; Temporary lift of security freeze — https://www.consumerfinance.gov/ask-cfpb/what-is-a-credit-freeze-or-security-freeze-on-my-credit-report-en-1341/

Answer Options
A
The borrower requests a temporary lift or removal at the bureaus needed for the new-credit pull
B
The lender underwrites from the borrower own copy of the report
C
The lender may bypass the freeze using its bureau agreement
D
The freeze blocks lending, so the file must be withdrawn today

Why This Is the Correct Answer

A. Arrange the relevant freeze lift before retrying the blocked request. A security freeze restricts prospective creditors from accessing the file. The consumer can lift it temporarily without abandoning the protection permanently. Scope and exceptions: A freeze does not prevent every kind of access: existing creditors and specified entities have exceptions, and consumers can inspect their own files. Coordinate the necessary bureaus and access period. This answer does not determine whether a personal copy meets a particular underwriting standard.

Why the Other Options Are Wrong

Option B: The lender underwrites from the borrower own copy of the report

A personal copy does not itself unblock the requested bureau access.

Option C: The lender may bypass the freeze using its bureau agreement

An ordinary bureau agreement is not authority to bypass the freeze.

Option D: The freeze blocks lending, so the file must be withdrawn today

The freeze can be lifted; it does not require immediate withdrawal.

Exam Tip

Resolve the access restriction rather than treating identity protection as a credit denial.

Was this explanation helpful?

More Origination Questions

Before the team acts on a servicing handoff check, a closing coordinator must address Asset Verification and Reserves. Which response is most defensible?

An MLO is reviewing procedures for a case where a cost changes after the Closing Disclosure has already been provided. What is the proper handling?

During a post-application update, a quality-control reviewer encounters a Credit Analysis and Evaluation issue. Which response should avoid a shortcut that would misapply the rule?

A construction-to-permanent loan will disburse in 5 draws over 11 months before the permanent phase begins. Which Regulation Z appendix provides a disclosure method for multiple-advance construction transactions?

Before closing, the team discovers that a borrower asks which upfront charge can be collected before intent to proceed. What is the safest compliant answer?

A construction loan agreement allows advances only after documented completion of specified work. A builder requests the next draw, but no completion evidence has been provided. What should occur?

Before releasing the final construction draw, which combination most directly supports project completion and clear collateral?

A construction-to-permanent loan will convert to a substantially higher fully amortizing payment. Which payment is especially important when assessing the borrower's long-term repayment capacity?

A construction-to-permanent note states that conversion requires completion, a certificate of occupancy, and no unresolved liens. Construction is finished, but a mechanic's lien remains. What should happen?

A branch manager asks about a loan file because a processor wants to omit known monthly obligations from underwriting. What should happen?

People Also Study

Related Study Resources

Practice More MLO Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your SAFE MLO exam.

Start Practicing