EstatePass
Originationmedium27% of exam

An underwriter documents income, employment, the monthly payment on this loan, mortgage-related obligations, current debts including a $340 child support order, and the debt-to-income ratio. She does not pull anything on a second mortgage the borrower is taking at closing. Which required ability-to-repay factor is missing because the simultaneous second mortgage was not evaluated?

Correct Answer

B) Incomplete: the payment on any simultaneous loan is 1 of the 8 factors

The monthly payment on a simultaneous loan is one of the eight factors a creditor must consider, precisely because two closings on the same day can leave a borrower who qualified for neither. Other choices: another creditor underwriting its own file does not relieve this one; there is no rule that six factors will do, since all eight are required; and the value of the dwelling is expressly excluded from the income and assets the creditor may rely on, so leaving it out is correct. Source: 12 CFR 1026.43(c)(2)

Answer Options
A
Complete: 6 of the 8 factors is the documented minimum for a compliant file
B
Incomplete: the payment on any simultaneous loan is 1 of the 8 factors
C
Incomplete: she has also left out the appraised value of the dwelling
D
Complete: a simultaneous loan is the other creditor's file to underwrite

Why This Is the Correct Answer

The monthly payment on a simultaneous loan is one of the eight factors a creditor must consider, precisely because two closings on the same day can leave a borrower who qualified for neither. Other choices: another creditor underwriting its own file does not relieve this one; there is no rule that six factors will do, since all eight are required; and the value of the dwelling is expressly excluded from the income and assets the creditor may rely on, so leaving it out is correct. Source: 12 CFR 1026.43(c)(2)

Was this explanation helpful?

More Origination Questions

Before the team acts on a servicing handoff check, a closing coordinator must address Asset Verification and Reserves. Which response is most defensible?

An MLO is reviewing procedures for a case where a cost changes after the Closing Disclosure has already been provided. What is the proper handling?

During a post-application update, a quality-control reviewer encounters a Credit Analysis and Evaluation issue. Which response should avoid a shortcut that would misapply the rule?

Between the Loan Estimate and closing, prepaid interest increases $180, homeowner insurance increases $95, transfer taxes increase $40, and a credit report fee for which the consumer could not shop increases $12. There is no valid revised estimate or other exception. Which increases violate TRID's zero-tolerance rule?

A construction-to-permanent loan will disburse in 5 draws over 11 months before the permanent phase begins. Which Regulation Z appendix provides a disclosure method for multiple-advance construction transactions?

Before closing, the team discovers that a borrower asks which upfront charge can be collected before intent to proceed. What is the safest compliant answer?

A construction loan agreement allows advances only after documented completion of specified work. A builder requests the next draw, but no completion evidence has been provided. What should occur?

Before releasing the final construction draw, which combination most directly supports project completion and clear collateral?

A construction-to-permanent loan will convert to a substantially higher fully amortizing payment. Which payment is especially important when assessing the borrower's long-term repayment capacity?

A construction-to-permanent note states that conversion requires completion, a certificate of occupancy, and no unresolved liens. Construction is finished, but a mechanic's lien remains. What should happen?

People Also Study

Related Study Resources

Practice More MLO Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your SAFE MLO exam.

Start Practicing