You discover that a subcontractor installed plumbing rough-in without proper permits. As the general contractor in Michigan, what is your primary responsibility?
Correct Answer
C) Stop work and ensure proper permits are obtained before proceeding
Michigan law requires that work stop until proper permits are obtained. The general contractor is responsible for ensuring all work is properly permitted before proceeding.
Why This Is the Correct Answer
Under Michigan law, the general contractor bears ultimate responsibility for ensuring all work is properly permitted before proceeding. When unpermitted work is discovered, the required action is to immediately stop work and secure the necessary permits before any further construction occurs. Proceeding without permits exposes the GC to license suspension, fines, and liability. The GC cannot pass this responsibility to the subcontractor or homeowner.
Why the Other Options Are Wrong
Option A: Document the issue but let the homeowner handle permits
Documenting the issue and letting the homeowner handle permits is an abdication of the general contractor's legal responsibility. In Michigan, the licensed contractor β not the homeowner β is accountable for ensuring proper permits are obtained. Delegating this to the homeowner does not relieve the GC of liability.
Option B: Replace the subcontractor immediately
Replacing the subcontractor immediately does not solve the permit violation. The unpermitted work still exists and must be addressed regardless of who performed it. Personnel decisions are secondary to resolving the code compliance issue.
Option D: Continue work and address permits at final inspection
Continuing work and addressing permits at final inspection is explicitly prohibited by Michigan law. Inspectors cannot retroactively approve work that was covered or completed without inspection. Proceeding without permits risks having to tear open walls, redo work, and face license disciplinary action.
Memory Technique
Think 'STOP before you drop.' When you find unpermitted work: STOP work immediately. No permits = no progress. The GC is the permit guardian β if there's no permit, there's no green light. Permit first, then proceed.
More Michigan Questions
A residential foundation wall in Michigan is 8 feet high with 2 feet above grade. The backfill exerts lateral pressure of 30 psf per foot of depth. What is the maximum lateral pressure at the bottom of the foundation wall?
A builder discovers that the electrical service entrance was installed without proper permits. According to Michigan law, what is the most appropriate next step?
What is the maximum allowable span for a 2x8 floor joist (Grade 2 Douglas Fir) at 16" O.C. with 40 psf live load and 10 psf dead load according to Michigan Building Code span tables?
According to Michigan Building Code, what is the maximum height of a wood-framed bearing wall using 2x4 studs with standard construction?
A homeowner requests to convert a bedroom into a bathroom on the second floor. What is the primary Michigan code concern the builder must address?
According to Michigan plumbing regulations, what is the minimum pipe size required for a water service line serving a single-family residence?
A contractor is building a basement foundation wall that is 8 feet high and will retain 6 feet of soil. What is the minimum wall thickness required by the Michigan Building Code for poured concrete?
A homeowner wants to install a gas fireplace in their living room. The contractor notices the existing gas line is 1/2 inch black iron pipe. For a 40,000 BTU fireplace with a 25-foot run, is this pipe size adequate according to Michigan gas code?
During a framing inspection, the building official notes that the contractor used 2x4 studs at 24 inches on center for an exterior wall. According to Michigan Building Code, what is the maximum wall height allowed for this configuration?
A contractor is installing a beam to support floor joists. The beam must carry a total load of 8,000 pounds over a 12-foot span. If the allowable fiber stress for the lumber grade is 1,200 psi, what is the minimum required section modulus?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A homeowner wants to calculate the heat loss through a wall section that is 10 feet wide by 8 feet high with R-20 insulation. If the temperature difference is 40Β°F, what is the heat loss in BTU/hour?
Next Question
During a rough electrical inspection in Michigan, you notice THWN-2 copper conductors are being used for a 20-amp branch circuit. What is the minimum wire gauge required?