Which Oregon building code governs residential construction of one and two-family dwellings?
Correct Answer
C) Oregon Residential Specialty Code
The Oregon Residential Specialty Code governs construction of one and two-family dwellings and townhouses.
Why This Is the Correct Answer
The Oregon Residential Specialty Code (ORSC) is Oregon's adopted and amended version of the International Residential Code (IRC). It governs the design and construction of one- and two-family dwellings and townhouses not more than three stories in height. The Oregon Building Codes Division administers it.
Why the Other Options Are Wrong
Option A: Oregon Structural Specialty Code
The Oregon Structural Specialty Code (OSSC) governs commercial and multi-family buildings that fall outside the scope of the ORSC. It is based on the International Building Code, not the IRC, and does not apply to typical single-family homes.
Option B: Oregon Mechanical Specialty Code
The Oregon Mechanical Specialty Code regulates HVAC, ventilation, and fuel gas systems β not the overall construction of residential dwellings. It applies to mechanical installations within buildings of all types.
Option D: Oregon Fire Code
The Oregon Fire Code governs fire prevention, protection systems, and occupancy fire-safety requirements. It does not serve as the primary construction code for one- and two-family dwellings.
Memory Technique
R = Residential: Oregon **R**esidential Specialty Code covers **R**esidences (1β2 family). If it has a front door for a family, it's the ORSC.
More Oregon Questions
Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?
An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?
A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?
Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?
A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?
A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.
A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?
What is the minimum experience requirement for obtaining an Oregon CCB contractor license?
A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?
A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?