Which NC contractor classification allows work on projects with no dollar limit?

Correct Answer

C) Unlimited General Contractor

The Unlimited General Contractor classification in NC allows work on projects with no dollar limit restrictions.

Answer Options
A
Limited General Contractor
B
Specialty Contractor
C
Unlimited General Contractor
D
Intermediate General Contractor

Why This Is the Correct Answer

The Unlimited General Contractor classification in NC is exactly what its name implies — there is no cap on the dollar value of projects a contractor holding this license can undertake. This is the highest tier of NC contractor licensure, requiring the most stringent examination and financial qualification.

Why the Other Options Are Wrong

Option A: Limited General Contractor

Option A ('Limited General Contractor') is incorrect. The Limited General Contractor classification in NC restricts the contractor to projects below a set dollar threshold. The word 'Limited' in the name signals that restrictions apply.

Option B: Specialty Contractor

Option B ('Specialty Contractor') is incorrect. Specialty Contractors are licensed for specific trades (plumbing, electrical, etc.) and may also have dollar limits on projects. They are not classified as general contractors with unlimited project scope.

Option D: Intermediate General Contractor

Option D ('Intermediate General Contractor') is incorrect. The Intermediate classification sits between Limited and Unlimited, with a project dollar cap higher than the Limited classification but still restricted — not unlimited.

Memory Technique

The name says it all: UNLIMITED = no limit. NC has a three-tier ladder: Limited → Intermediate → Unlimited. As you climb the ladder, dollar caps go away. Only the top rung (Unlimited) has no cap. Think of it as an 'all-access pass' for project size.

Was this explanation helpful?

More North Carolina Questions

A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?

A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?

A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?

A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?

A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?

A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?

A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?

A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?

Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:

Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000:

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.