What is the maximum project value for an Unlimited General Contractor in North Carolina?

Correct Answer

B) No limit

Unlimited General Contractors in NC have no monetary restrictions on project values they can undertake.

Answer Options
A
$2,000,000
B
No limit
C
$1,000,000
D
$500,000

Why This Is the Correct Answer

By definition, an Unlimited General Contractor license in North Carolina places no upper limit on the dollar value of projects the licensee may undertake. This is the highest tier of the NC General Contractor license classification system, granting the licensee authority to bid and perform construction contracts of any value anywhere in the state.

Why the Other Options Are Wrong

Option A: $2,000,000

$2,000,000 is not a defined project value cap for any NC contractor license tier. It is a plausible-sounding large number but does not correspond to any actual NC licensing threshold. This distractor tests whether candidates confuse a specific dollar limit with the 'no limit' concept.

Option C: $1,000,000

$1,000,000 is associated with the Intermediate General Contractor license tier in NC (projects up to $1,000,000 or $1,500,000 depending on the specific classification period). Selecting this option confuses Intermediate with Unlimited.

Option D: $500,000

$500,000 is the project value ceiling for a Limited General Contractor in NC, not the Unlimited tier. This is the most likely option for candidates who know NC has tiered limits but are unsure which limit belongs to which tier.

Memory Technique

Unlimited = no limit. The word itself is the answer. When you see 'Unlimited General Contractor' on an NC exam question asking for a project value cap, the answer is always 'no limit.' Think: 'Unlimited license → unlimited project value → no ceiling.'

Was this explanation helpful?

More North Carolina Questions

A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?

A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?

A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?

A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?

A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?

A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?

A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?

A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?

Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:

Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000:

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.