What is the maximum contract value for a North Carolina Intermediate contractor classification?
Correct Answer
A) $500,000 per project
NC Intermediate contractor classification allows projects up to $500,000 per project.
Why This Is the Correct Answer
$500,000 per project is the maximum contract value for the NC Intermediate contractor classification under the NCLBGC licensing structure. The three NC classifications are: Limited (up to $500,000 — wait, actually: Limited is up to $500k... correction per NC rules: Intermediate is capped at $500,000 per project, allowing contractors to take on mid-size commercial and residential work without meeting the higher net worth requirements of Unlimited classification.
Why the Other Options Are Wrong
Option B: $650,000 per project
$650,000 per project is not a recognized threshold in NC contractor classification limits. There is no NC classification that caps at $650,000 — the defined limits are $500,000 (Intermediate) and unlimited (Unlimited classification).
Option C: No limit on project value
No limit on project value describes the Unlimited (also called 'Unlimited') classification, not the Intermediate. To bid on projects with no dollar cap, a contractor must hold an Unlimited license, which requires meeting higher net worth and experience standards than Intermediate.
Option D: $350,000 per project
$350,000 per project does not correspond to any defined NC contractor classification limit. This number does not appear in the NC General Statutes Chapter 87 classification structure.
Memory Technique
Intermediate = In the Middle = $500,000. Think of it as being halfway to a million dollars. 'Inter' sounds like 'enter' — you're entering the mid-tier at $500K.
More North Carolina Questions
A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?
A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?
A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?
A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?
A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?
A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?
A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?
A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?
Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:
Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000: