EstatePass
North CarolinaNC Supplementmedium100% of exam part

According to NC building codes, when is a building permit NOT required?

Correct Answer

D) One-story detached accessory structures under 200 square feet

NC building codes typically exempt small detached accessory structures under 200 square feet from permit requirements.

Answer Options
A
Residential additions over 400 square feet
B
Commercial renovations over $5,000
C
New residential construction
D
One-story detached accessory structures under 200 square feet

Why This Is the Correct Answer

Option D (one-story detached accessory structures under 200 square feet) is correct. NC building codes exempt small detached accessory structures — such as storage sheds — that are single-story and under 200 square feet from permit requirements, provided they meet other local zoning conditions.

Why the Other Options Are Wrong

Option A: Residential additions over 400 square feet

Residential additions over 400 square feet absolutely require a building permit in NC. Any addition that increases conditioned or livable space triggers permit and inspection requirements regardless of size threshold above the exemption.

Option B: Commercial renovations over $5,000

Commercial renovations over $5,000 require permits in NC. Commercial work has lower triggering thresholds than residential work, not higher, due to occupancy safety concerns.

Option C: New residential construction

New residential construction always requires a building permit in NC — no exceptions. This is one of the clearest non-exempt categories in any jurisdiction.

Memory Technique

Remember '200 sq ft shed rule': a small detached storage shed in the backyard doesn't need a permit. Think of it as the 'garden shed exception.' Anything attached, multi-story, or larger crosses into permit territory.

Was this explanation helpful?

More North Carolina Questions

A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?

A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?

A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?

A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?

A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?

A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?

A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?

A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?

Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:

Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000:

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.