Under North Carolina workers' compensation law, what is the waiting period before benefits begin for a temporary total disability claim?
Correct Answer
B) 7 days
NC workers' compensation law establishes a 7-day waiting period before temporary total disability benefits begin, though benefits are retroactive if disability exceeds 21 days.
Why This Is the Correct Answer
The correct answer is B (7 days). NC workers' compensation law establishes a 7-day waiting period before temporary total disability (TTD) benefits begin. Importantly, if the disability continues beyond 21 days, the benefits become retroactive to cover those first 7 days as well.
Why the Other Options Are Wrong
Option A: 14 days
14 days is incorrect. No state standard waiting period of 14 days exists for NC workers' compensation TTD claims. This is a plausible-sounding distractor but does not reflect NC law.
Option C: 21 days
21 days is not the waiting period β it is the threshold at which benefits become retroactive. If the worker's disability lasts longer than 21 days, the insurer must go back and pay for the initial 7-day waiting period. Confusing the 21-day retroactivity trigger with the 7-day waiting period is a very common mistake.
Option D: 3 days
3 days is incorrect. Some states use a 3-day waiting period, but NC uses 7 days. Three days may seem logical as a shorter waiting period, but it does not match NC statute.
Memory Technique
Use the 7-21 rule: Wait 7 days, get paid back if out 21+ days. Think of it as a 'ladder': step 1 (day 1-7) = waiting period, no pay; step 2 (day 8-21) = benefits begin; step 3 (day 22+) = retroactive pay for the first 7 days kicks in.
More North Carolina Questions
A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?
A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?
A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?
A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?
A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?
A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?
A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?
A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?
Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:
Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000: