During construction of a new home, the contractor discovers expansive clay soil conditions. According to Michigan Building Code, what is the recommended foundation design modification?
Correct Answer
C) Install a deeper foundation with proper drainage
The Michigan Building Code recommends deeper foundations with proper drainage systems to mitigate the effects of expansive clay soils.
Why This Is the Correct Answer
Expansive clay soils swell when they absorb water and shrink when they dry, creating vertical movement that can damage foundations. The Michigan Building Code's recommended approach is to install a deeper foundation that reaches below the active zone of moisture change, combined with proper drainage systems (e.g., perforated drain tile, gravel backfill, waterproof membranes) to manage water away from the foundation. This combination addresses both bearing depth and moisture management.
Why the Other Options Are Wrong
Option A: Add steel reinforcement to standard footings
Adding steel reinforcement to standard-depth footings strengthens the footing against cracking but does not eliminate the root cause β soil movement due to moisture changes. A reinforced footing at standard depth will still heave and settle with expansive clay.
Option B: Use post-tensioned concrete slabs
Post-tensioned concrete slabs are a solution commonly used in arid climates (e.g., Texas, Arizona) for slab-on-grade construction over expansive soils. Michigan's climate and typical basement construction practices make this less applicable, and it does not address the basement foundation scenario described.
Option D: Increase footing width by 50%
Widening the footing by 50% distributes the load over a larger area to address bearing capacity issues, not expansive soil heave. Expansive clay's problem is volumetric change with moisture, not insufficient bearing capacity.
Memory Technique
Remember 'Deep + Dry = Safe Foundation in Clay': go deep enough to escape the moisture-active zone, and keep the clay dry with drainage. Two D's: Depth and Drainage.
More Michigan Questions
A residential foundation wall in Michigan is 8 feet high with 2 feet above grade. The backfill exerts lateral pressure of 30 psf per foot of depth. What is the maximum lateral pressure at the bottom of the foundation wall?
A builder discovers that the electrical service entrance was installed without proper permits. According to Michigan law, what is the most appropriate next step?
What is the maximum allowable span for a 2x8 floor joist (Grade 2 Douglas Fir) at 16" O.C. with 40 psf live load and 10 psf dead load according to Michigan Building Code span tables?
According to Michigan Building Code, what is the maximum height of a wood-framed bearing wall using 2x4 studs with standard construction?
A homeowner requests to convert a bedroom into a bathroom on the second floor. What is the primary Michigan code concern the builder must address?
According to Michigan plumbing regulations, what is the minimum pipe size required for a water service line serving a single-family residence?
A contractor is building a basement foundation wall that is 8 feet high and will retain 6 feet of soil. What is the minimum wall thickness required by the Michigan Building Code for poured concrete?
A homeowner wants to install a gas fireplace in their living room. The contractor notices the existing gas line is 1/2 inch black iron pipe. For a 40,000 BTU fireplace with a 25-foot run, is this pipe size adequate according to Michigan gas code?
During a framing inspection, the building official notes that the contractor used 2x4 studs at 24 inches on center for an exterior wall. According to Michigan Building Code, what is the maximum wall height allowed for this configuration?
A contractor is installing a beam to support floor joists. The beam must carry a total load of 8,000 pounds over a 12-foot span. If the allowable fiber stress for the lumber grade is 1,200 psi, what is the minimum required section modulus?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass