An Oregon contractor is renovating a home built in 1968. The work involves disturbing 25 square feet of painted surfaces. According to Oregon lead-based paint regulations, what action is required?
Correct Answer
D) Use EPA RRP certified renovator and follow safe work practices
Work on pre-1978 homes disturbing 20+ sq ft of painted surfaces requires EPA RRP certification and safe work practices under Oregon regulations.
Why This Is the Correct Answer
Option D is correct. The home was built before 1978 (1968) and 25 sq ft of disturbed painted surfaces exceeds the 20 sq ft exterior threshold (and the 6 sq ft interior threshold per room). Oregon follows the EPA RRP Rule, requiring the contractor to use an EPA RRP certified renovator and follow prescribed safe work practices including containment and cleaning verification.
Why the Other Options Are Wrong
Option A: Obtain environmental impact assessment
Obtaining an environmental impact assessment is not a lead-paint regulatory requirement under Oregon's RRP rules. That process applies to large-scale environmental projects, not residential renovations.
Option B: Provide EPA lead pamphlet to owner only
Providing the EPA lead pamphlet to the owner only is insufficient. While distributing the pamphlet is one required step, it alone does not satisfy the obligation β the contractor must also use a certified renovator and follow safe work practices.
Option C: No special requirements apply
No special requirements apply is completely incorrect. A pre-1978 home with 25 sq ft of disturbed painted surfaces triggers full EPA RRP compliance requirements in Oregon.
Memory Technique
Think of RRP as a three-part package: Renovator certified + Rules followed + Pamphlet given. You need ALL THREE β the pamphlet alone is only 1 of 3. The number 25 > 20 (exterior threshold), so compliance is mandatory.
More Oregon Questions
Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?
An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?
A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?
Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?
A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?
A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.
A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?
What is the minimum experience requirement for obtaining an Oregon CCB contractor license?
A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?
A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Under ORS 701, which of the following activities requires a CCB license in Oregon?
Next Question
A subcontractor files a lien for $8,500 on an Oregon residential project. Under ORS 87, what is the maximum amount that can be recovered if the property owner already paid the general contractor in full?