OregonOR B&Lmedium100% of exam part

According to Oregon residential contractor requirements, written contracts exceeding what dollar amount must include specific statutory disclosures?

Correct Answer

D) $1,000

Oregon law requires specific disclosures in written contracts for residential work exceeding $1,000.

Answer Options
A
$5,000
B
$2,000
C
$10,000
D
$1,000

Why This Is the Correct Answer

$1,000 is the threshold above which Oregon law requires specific statutory disclosures in written contracts for residential work. This aligns with the same $1,000 licensing trigger under ORS 701, creating a consistent framework for consumer protection.

Why the Other Options Are Wrong

Option A: $5,000

$5,000 is too high. Requiring disclosures only at $5,000 would leave many mid-size residential jobs unprotected, which contradicts Oregon's consumer-protection intent.

Option B: $2,000

$2,000 is incorrect. There is no statutory disclosure threshold set at $2,000 in Oregon residential contractor law.

Option C: $10,000

$10,000 is far too high. This would exempt the vast majority of residential jobs from disclosure requirements, undermining homeowner protections.

Memory Technique

One rule, one number: '$1,000 = license + disclosure.' Both the CCB license requirement and the written contract disclosure requirement share the same $1,000 trigger. Remember one, remember both.

Was this explanation helpful?

More Oregon Questions

Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?

An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?

A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?

Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?

A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?

A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.

A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?

What is the minimum experience requirement for obtaining an Oregon CCB contractor license?

A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?

A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.