EstatePass
OregonOR B&Lmedium100% of exam part

According to Oregon plumbing codes, what is the minimum slope requirement for horizontal drainage piping?

Correct Answer

A) 1/4 inch per foot

Oregon plumbing codes require a minimum slope of 1/4 inch per foot (2% grade) for horizontal drainage piping.

Answer Options
A
1/4 inch per foot
B
1/8 inch per foot
C
1/2 inch per foot
D
1 inch per foot

Why This Is the Correct Answer

Option A is correct. Oregon plumbing codes require horizontal drainage piping to slope at a minimum of 1/4 inch per foot (equivalent to a 2% grade). This slope ensures adequate flow velocity to carry waste and prevent solids from settling in the pipe.

Why the Other Options Are Wrong

Option B: 1/8 inch per foot

1/8 inch per foot is below the code minimum and provides insufficient flow velocity. At this slope, solids can settle out and cause blockages. Oregon code does not permit this as a minimum for drainage piping.

Option C: 1/2 inch per foot

1/2 inch per foot exceeds the minimum and would actually be too steep for larger diameter pipes—it can cause the liquid to race ahead of solids, leaving solids behind. The 1/4 inch minimum is the standard that balances flow velocity with solid transport.

Option D: 1 inch per foot

1 inch per foot is far too steep for standard horizontal drain lines. Such a steep grade would cause velocity separation issues and is not a recognized standard slope for drainage piping. This figure is a distractor.

Memory Technique

Quarter-inch rule: 'A quarter inch a foot keeps the drain clean.' Visualize a ruler lying flat—every foot, the pipe drops just one quarter-inch. That's enough fall to keep water and waste moving without causing separation issues.

Was this explanation helpful?

More Oregon Questions

Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?

An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?

A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?

Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?

A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?

A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.

A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?

What is the minimum experience requirement for obtaining an Oregon CCB contractor license?

A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?

A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.