According to Louisiana environmental regulations, what is the minimum distance a construction site must maintain from a public water supply well?
Correct Answer
C) 150 feet
Louisiana environmental regulations require construction activities to maintain a minimum 150-foot buffer from public water supply wells to prevent contamination.
Why This Is the Correct Answer
Louisiana environmental regulations require a minimum 150-foot buffer between construction activities and public water supply wells. This setback distance is designed to prevent contamination of drinking water sources from construction site runoff, chemicals, or soil disturbance.
Why the Other Options Are Wrong
Option A: 200 feet
200 feet is a larger buffer than required. While greater distance is always safer from an environmental standpoint, the regulatory minimum under Louisiana law is 150 feet, not 200 feet.
Option B: 100 feet
100 feet is less than the required 150-foot minimum and would not provide adequate protection for a public water supply well under Louisiana environmental standards.
Option D: 50 feet
50 feet is far too close to a public water supply well and would not meet Louisiana's environmental protection requirements. This distance might apply to private wells with different risk profiles.
Memory Technique
150 feet = 'halfway to 300.' Or think of it as exactly 50 yards—the distance between the 50-yard line and the end zone on a football field. A football field's end zone protects the well.
More Louisiana Questions
A contractor in Louisiana completes $85,000 worth of work on a residential project. The owner pays $70,000 but disputes the remaining $15,000. If the contractor files a lien claim, what percentage penalty can be awarded if the contractor prevails in court?
A contractor discovers contaminated soil during excavation that requires special disposal. The disposal cost is $12,000, and transportation is $3,500. If this was not foreseeable from the contract documents, who typically bears this cost under Louisiana law?
A construction worker is injured on a Louisiana job site. The contractor's workers' compensation carrier has 15 days to investigate. If they don't respond within this period, what happens to the claim?
Under Louisiana law, what is the minimum amount of workers' compensation insurance coverage required for construction contractors?
A contractor's employee is injured on a job site in Louisiana. The contractor has workers' compensation insurance. Which statement is correct regarding the employee's rights?
Under Louisiana Civil Code, if a building contract does not specify a completion date, when is the work considered to be due?
Under Louisiana building codes, what is the minimum width required for emergency egress windows in bedrooms?
A Class B contractor in Louisiana wants to bid on a project worth $175,000. What action must they take?
A contractor's worker is injured and files for workers' compensation. The injury occurred due to the worker's intoxication. Under Louisiana law, what is the likely outcome?
A general contractor discovers contaminated soil during excavation for a commercial project in Louisiana. Which state agency must be notified?