A contractor's workers' compensation policy has an experience modification rate (EMR) of 1.15. If the base premium is $8,500, what is the actual premium?
Correct Answer
D) $9,775
Actual premium = Base premium × EMR = $8,500 × 1.15 = $9,775.
Why This Is the Correct Answer
Actual Premium = Base Premium × EMR = $8,500 × 1.15 = $9,775. An EMR above 1.0 indicates a worse-than-average claims history, resulting in a premium surcharge. The EMR directly multiplies the base premium.
Why the Other Options Are Wrong
Option A: $8,500
$8,500 is the base premium before applying the EMR. This answer ignores the modification entirely, as if the EMR were 1.0 (average). An EMR of 1.15 always increases the premium above base.
Option B: $7,391
$7,391 would result from an EMR below 1.0 (approximately 0.87), which would indicate a better-than-average safety record and a premium discount. An EMR of 1.15 increases — not decreases — the premium.
Option C: $10,200
$10,200 results from multiplying $8,500 × 1.20, applying a 20% surcharge instead of the stated 15% (EMR of 1.15). This is an arithmetic error using a rounded or incorrect modifier.
Memory Technique
EMR is a multiplier: Actual = Base × EMR. Think of EMR as your safety score: 1.0 is average, below 1.0 is a reward (lower premium), above 1.0 is a penalty (higher premium). 1.15 = 15% penalty on top of base.
More Michigan Questions
A Michigan contractor forms an S-Corporation. What is the maximum number of shareholders allowed?
A contractor's employee is injured on a job site in Michigan. The contractor's workers' compensation insurance has a $500 deductible per claim. The total medical costs are $12,500 and lost wages are $3,200. What is the contractor's out-of-pocket cost for this claim?
What is the minimum general liability insurance coverage amount required for Michigan residential builders?
Under Michigan Act 299, what is the consequence for a contractor who performs work outside the scope of their license classification?
A contractor discovers that a subcontractor has filed a construction lien against their project. The general contractor believes the lien is invalid. What is the primary legal mechanism to challenge the lien in Michigan?
Under Michigan Act 299, what happens if a contractor continues to work without a valid license after it expires?
Which of the following best describes the 'pay when paid' clause limitation under Michigan law?
A project has total costs of $180,000 including $75,000 labor and $105,000 materials. With workers compensation at 7.8% of labor costs and general liability at 0.4% of total costs, what are the combined insurance costs?
A Michigan contractor is forming an LLC. What is the minimum general liability insurance coverage required for residential builders under Michigan law?
Under Michigan Act 299, a contractor's license must be renewed every:
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Project Management
60 questions · 70% to pass
