A contractor performs $12,500 of work on a residential project in Oregon. The homeowner fails to pay after 45 days. Calculate the maximum lien amount the contractor can claim under ORS 87.
Correct Answer
B) $12,500
Under ORS 87, the lien amount cannot exceed the actual amount owed for work performed, which is $12,500.
Why This Is the Correct Answer
Under ORS 87, a mechanics' lien cannot exceed the actual amount owed for labor and materials provided. The contractor performed $12,500 worth of work and that is the maximum lien amount claimable. Liens are not a tool to recover more than the actual debt; they simply secure the unpaid contract amount.
Why the Other Options Are Wrong
Option A: $13,750
$13,750 represents the original amount plus a 10% markup, which is not how Oregon lien law calculates the maximum claimable amount. Interest or penalties do not automatically inflate the lien ceiling.
Option C: $15,000
$15,000 exceeds the actual work performed. While it might seem like a 'safe' round number or a buffer for costs, the lien cannot exceed what is actually owed for the work done.
Option D: $18,750
$18,750 represents the original amount plus 50%, which has no basis in Oregon lien law. There is no multiplier applied to the actual work value when calculating the maximum lien amount.
Memory Technique
Lien = Limit to what you're Owed. The maximum lien is exactly the unpaid amount β no more, no less. Think of a lien as a mirror reflection of the debt, not a magnifying glass.
More Oregon Questions
Under ORS 701, what is the minimum amount of public liability insurance required for a CCB licensed contractor?
An employee is injured on a job site. The contractor's workers compensation premium was $2,400 annually. If they were operating without coverage, what is the minimum penalty multiplier applied to the premium?
A contractor completes a $12,000 deck project but the homeowner claims defective work. Under ORS 87, how long does the contractor have to file a lien for unpaid amounts?
Under ORS 701, what is the maximum amount a residential contractor can collect as a down payment before starting work?
A homeowner cancels a $8,000 roofing contract within the 3-day right to cancel period. The contractor had already ordered $1,200 in custom materials. How much can the contractor retain?
A general contractor hires a subcontractor who performs $15,000 worth of electrical work. The property owner pays the general contractor but the general contractor fails to pay the subcontractor. Calculate the subcontractor's maximum lien claim under ORS 87.
A renovation project in a 1972 home will disturb 15 square feet of painted trim. The contractor is not RRP certified. What must they do under Oregon lead regulations?
What is the minimum experience requirement for obtaining an Oregon CCB contractor license?
A homeowner hired an unlicensed contractor who abandoned a $25,000 project. The homeowner wants to file a claim with the CCB. What is the likely outcome?
A residential contractor completes a $35,000 kitchen remodel but fails to obtain required permits. Under Oregon law, what is the potential penalty?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A contractor is renovating a kitchen in a home built in 1955. The work will disturb 8 square feet of painted surface. What lead-based paint requirement applies under Oregon regulations?
Next Question
Under ORS 87, how many days does a prime contractor have to provide a Notice to Owner after receiving a Notice of Right to Lien from a subcontractor?
