A carpet-to-tile doorway has an unfinished loose carpet edge and abrupt uneven transition because the specified transition detail was omitted. What needs correction?

Correct Answer

D) The exposed edge and unsafe flooring transition.

Correct the exposed edge and height transition using a detail suitable for the flooring system. A strip is one possible solution; this question does not impose one product on every transition.

Answer Options
A
Accept the transition because both finish materials are new.
B
Wait for foot traffic to press the loose edge into place.
C
Cover the edge temporarily without restoring the specified detail.
D
The exposed edge and unsafe flooring transition.

Why This Is the Correct Answer

Correct the exposed edge and height transition using a detail suitable for the flooring system. A strip is one possible solution; this question does not impose one product on every transition.

Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →

Was this explanation helpful?

More Class B Trade Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.