Building within the Coastal Construction Control Line requires:

Correct Answer

C) Florida DEP permit

Construction seaward of the CCCL requires a Florida DEP permit.

Answer Options
A
No special permits
B
Only local permits
C
Florida DEP permit
D
Federal permit only