A mortgage file is paused during a policy refresh meeting because of ARM Rate Caps. Which answer should resolve the issue before the file moves forward?

Correct Answer

C) Update rate-dependent terms after the lock

Why this is correct: For an Adjustable-Rate Mortgage (ARM), the rate caps (periodic and lifetime) are critical loan terms. If a file is paused due to an ARM Rate Caps issue, the compliant action is to ensure all rate-dependent terms, which are calculated based on the capped rates, are accurate and updated in the disclosures. "Update rate-dependent terms after the lock" ensures that the payment schedule and other disclosures reflect the correct parameters, including the effects of the caps. Why the other choices are wrong: "Change locked terms without documenting the lock agreement and borrower authorization" violates requirements for clear documentation and consumer consent. "Treat a float-down as automatic when the lock agreement does not provide it" is incorrect; float-downs are not automatic and must be contractually provided. "Apply the servicing transfer timing rule even though the file is testing ARM Rate Caps" is irrelevant; servicing rules do not resolve ARM cap issues. Exam tip: ARM disclosures must clearly show the initial rate, adjustment periods, index, margin, and all applicable rate caps. Any lock change affecting these requires updated disclosures.

Answer Options
A
Change locked terms without documenting the lock agreement and borrower authorization.
B
Treat a float-down as automatic when the lock agreement does not provide it.
C
Update rate-dependent terms after the lock
D
Apply the servicing transfer timing rule even though the file is testing ARM Rate Caps.

Why This Is the Correct Answer

The correct response is "Update rate-dependent terms after the lock" because Rate locks can require revised Loan Estimates and accurate interest-rate-dependent disclosures.

Why the Other Options Are Wrong

Option A: Change locked terms without documenting the lock agreement and borrower authorization.

This choice is a tempting shortcut, but it conflicts with rate-lock documentation because the file still needs the required documentation, timing, or rule-based review before the action is taken.

Option B: Treat a float-down as automatic when the lock agreement does not provide it.

This choice is not the best answer because it applies the wrong file step for rate-lock documentation; the governing rule is tested by the correct option.

Option D: Apply the servicing transfer timing rule even though the file is testing ARM Rate Caps.

This distractor shifts the issue to a different trigger, product, or timing rule instead of applying the rule tested in the stem.

Memory Technique

rate-lock agreements: identify the rule being tested, then choose the action that documents or applies that rule before the file moves forward.

Exam Tip

For rate-lock documentation questions, separate the required file step from plausible sales, timing, or documentation shortcuts.

Common Mistakes to Avoid

  • -Choosing an internal exception instead of the governing rule
  • -Treating preliminary or informal facts as a substitute for required documentation
  • -Answering from a familiar but unrelated mortgage topic
Was this explanation helpful?

More Origination Questions

Before the team acts on a servicing handoff check, a closing coordinator must address Asset Verification and Reserves. Which response is most defensible?

An MLO is reviewing procedures for a case where a cost changes after the Closing Disclosure has already been provided. What is the proper handling?

During a post-application update, a quality-control reviewer encounters a Credit Analysis and Evaluation issue. Which response should avoid a shortcut that would misapply the rule?

A construction-to-permanent loan will disburse in 5 draws over 11 months before the permanent phase begins. Which Regulation Z appendix provides a disclosure method for multiple-advance construction transactions?

Before closing, the team discovers that a borrower asks which upfront charge can be collected before intent to proceed. What is the safest compliant answer?

A construction loan agreement allows advances only after documented completion of specified work. A builder requests the next draw, but no completion evidence has been provided. What should occur?

Before releasing the final construction draw, which combination most directly supports project completion and clear collateral?

A construction-to-permanent loan will convert to a substantially higher fully amortizing payment. Which payment is especially important when assessing the borrower's long-term repayment capacity?

A construction-to-permanent note states that conversion requires completion, a certificate of occupancy, and no unresolved liens. Construction is finished, but a mechanic's lien remains. What should happen?

A branch manager asks about a loan file because a processor wants to omit known monthly obligations from underwriting. What should happen?

People Also Study

Related Study Resources

Practice More MLO Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your SAFE MLO exam.

Start Practicing