EstatePass
Originationhard27% of exam

A creditor delivers the Loan Estimate four business days before a planned consummation. Even though it met the three-day application-delivery rule, what separate timing problem exists?

Correct Answer

D) Consummation generally cannot occur until seven business days after the Loan Estimate was delivered or mailed

Why this is correct: TRID imposes two separate timing rules. First, the Loan Estimate must be delivered within three business days of application. Second, there is a mandatory waiting period: consummation generally cannot occur until at least seven business days after the Loan Estimate is delivered or placed in the mail to the consumer. Delivering the Loan Estimate only four business days before a planned closing violates this seven-business-day waiting period, even if the three-day delivery rule was met. Why the other choices are wrong: The choice "The Loan Estimate must be delivered after consummation" is completely wrong; it is a pre-consummation disclosure. The choice "No Loan Estimate is allowed once a closing date is selected" is wrong; selecting a closing date does not prohibit providing the Loan Estimate. The choice "The creditor must wait 30 days" is wrong; the specific rule is a seven-business-day wait, not 30 days. Exam tip: Remember the dual timing rules: 3 days to deliver the Loan Estimate after application, and a 7-business-day wait between that delivery and consummation.

Answer Options
A
The Loan Estimate must be delivered after consummation
B
No Loan Estimate is allowed once a closing date is selected
C
The creditor must wait 30 days
D
Consummation generally cannot occur until seven business days after the Loan Estimate was delivered or mailed

Why This Is the Correct Answer

Why this is correct: TRID imposes two separate timing rules. First, the Loan Estimate must be delivered within three business days of application. Second, there is a mandatory waiting period: consummation generally cannot occur until at least seven business days after the Loan Estimate is delivered or placed in the mail to the consumer. Delivering the Loan Estimate only four business days before a planned closing violates this seven-business-day waiting period, even if the three-day delivery rule was met. Why the other choices are wrong: The choice "The Loan Estimate must be delivered after consummation" is completely wrong; it is a pre-consummation disclosure. The choice "No Loan Estimate is allowed once a closing date is selected" is wrong; selecting a closing date does not prohibit providing the Loan Estimate. The choice "The creditor must wait 30 days" is wrong; the specific rule is a seven-business-day wait, not 30 days. Exam tip: Remember the dual timing rules: 3 days to deliver the Loan Estimate after application, and a 7-business-day wait between that delivery and consummation.

Was this explanation helpful?

More Origination Questions

Before the team acts on a servicing handoff check, a closing coordinator must address Asset Verification and Reserves. Which response is most defensible?

An MLO is reviewing procedures for a case where a cost changes after the Closing Disclosure has already been provided. What is the proper handling?

During a post-application update, a quality-control reviewer encounters a Credit Analysis and Evaluation issue. Which response should avoid a shortcut that would misapply the rule?

A construction-to-permanent loan will disburse in 5 draws over 11 months before the permanent phase begins. Which Regulation Z appendix provides a disclosure method for multiple-advance construction transactions?

Before closing, the team discovers that a borrower asks which upfront charge can be collected before intent to proceed. What is the safest compliant answer?

A construction loan agreement allows advances only after documented completion of specified work. A builder requests the next draw, but no completion evidence has been provided. What should occur?

Before releasing the final construction draw, which combination most directly supports project completion and clear collateral?

A construction-to-permanent loan will convert to a substantially higher fully amortizing payment. Which payment is especially important when assessing the borrower's long-term repayment capacity?

A construction-to-permanent note states that conversion requires completion, a certificate of occupancy, and no unresolved liens. Construction is finished, but a mechanic's lien remains. What should happen?

A branch manager asks about a loan file because a processor wants to omit known monthly obligations from underwriting. What should happen?

People Also Study

Related Study Resources

Practice More MLO Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your SAFE MLO exam.

Start Practicing