EstatePass
CA • P&C

California Property & Casualty Insurance Exam — Practice Test & Study Guide

Sell property, casualty, auto and commercial lines insurance. Covers homeowners, commercial property, liability coverage, business owner policies, and underwriting fundamentals.

Our mock exam
100 questions
what you sit here, not the state's count
Official time limit
195 min
CA exam, verified
Passing score
60%
set by CDI
Pre-licensing
12h
required in CA

Exam content outline

From the official CDI P&C content outline. Mock exams sample at these weights.

SectionWeight≈ Questions
National-PC-I Property Policies16%16
National-PC-II Property Terms & Concepts12%12
National-PC-III Property Provisions & Contract Law10%10
National-PC-IV Casualty Types & Bonds17%17
National-PC-V Casualty Terms & Concepts12%12
National-PC-VI Casualty Provisions13%13
National-PC-VII Federal Regulation10%10
National-PC-VIII Marine5%5
National-PC-IX Specialty Lines5%5

Sample questions

Items from our P&C bank, aligned to the CA CDI outline — see the difficulty and explanation depth.

Q1 • Casualty Provisionsmedium

A construction manager retained as agent for the owner is sued for negligent scheduling that delayed completion and caused economic loss. Its CGL carries ISO CG 22 34 (Exclusion — Construction Management Errors And Omissions). How does CG 22 34 respond?

AIt excludes only intentional or willful misconduct by the construction manager and expressly preserves the policy's coverage for negligent scheduling, supervision, and other management errors and omissions.
BIt provides affirmative construction-management errors-and-omissions coverage subject to a scheduled $1 million sublimit per claim and in the policy aggregate.
CIt excludes injury arising out of the rendering of or failure to render construction management services such as scheduling, supervision, inspection, and cost estimating.
DIt excludes the insured's own physical construction work and labor but expressly covers all of the insured's professional management and administrative activities.
Why

CG 22 34 excludes all BI/PD/P&AI arising from rendering or failure to render construction management professional services like scheduling and supervision.

Q2 • Casualty Provisionshard

A subcontractor's CGL names a general contractor as an additional insured via CG 20 10 and contains primary-and-non-contributory language. The GC's own CGL has standard Section IV.4 Other Insurance language and lists the GC as a named insured. A claim arises from the sub's ongoing operations. Under the standard Section IV.4 hierarchy, how do the two policies coordinate?

ABoth policies share pro-rata by limits under Method 1, because each independently insures the very same risk and loss.
BThe GC's CGL is primary because the GC is its own named insured and a policy is always primary as to its named insured; the sub's policy therefore drops to excess despite carrying the primary-and-non-contributory endorsement language.
CBoth policies pay in equal shares until the lower-limit policy is exhausted, after which the remaining policy continues alone.
DThe sub's CGL is primary under its primary-and-non-contributory endorsement; the GC's own CGL is excess under §IV.4.b.(1)(b), which makes it excess when the GC is an additional insured elsewhere.
Why

Sub's policy is primary by P&NC; GC's own policy is excess because GC is AI under another policy.

Q3 • Property Provisions & Contract Lawmedium

An applicant submits an application for an HO-3 policy at a $300,000 Coverage A limit. The insurer returns a policy issued at $250,000 Coverage A with a note explaining the lower limit reflects current replacement-cost estimates. Under classical contract formation doctrine, this insurer response constitutes:

AAcceptance, because the insurer issued a policy responsive to the application even though the Coverage A limit was materially reduced
BAcceptance, because under insurance contracts the insurer's silence or partial performance always operates as a binding acceptance
CA counter-offer, which the applicant may accept by paying premium or retaining the policy without timely objection
DA rejection that terminates the original offer and requires the applicant to submit an entirely new application to revive negotiations
Why

An insurer-issued policy materially different from the application is a counter-offer.

Q4 • Property Policieseasy

An insured attaches ISO HO 04 65 to her HO-3. A windstorm destroys a five-year-old sofa with an ACV of $300 and a replacement cost of $900. She replaces the sofa for $900. Under HO 04 65, what does the insurer ultimately pay (ignoring deductible)?

A$300, because Coverage C personal property always settles at actual cash value, with replacement-cost loss settlement reserved exclusively for Coverage A dwelling losses
B$600, calculated as the simple average of the $300 actual cash value and the $900 replacement cost, with the insured bearing the remaining depreciation as a co-payment
CNothing, because household furniture such as a sofa is among the categories of personal property expressly excluded from the scope of the HO 04 65 endorsement
D$900, the replacement cost, because HO 04 65 amends Coverage C loss settlement from actual cash value to replacement cost on Coverage C personal property
Why

HO 04 65 changes Coverage C loss settlement from ACV to replacement cost; the insurer pays the $900 RC since the insured actually replaced the item.

Q5 • CA-PC-IX CA Homeowners Dwelling Propertymedium

A CA homeowner suffers a partial fire loss. The adjuster issues a written denial dated March 1, 2025. Under the standard fire policy suit-clause incorporated by Ins. Code § 2071, by when must the insured file suit on the policy?

AWithin 12 months after inception of the loss, but the limitations period is equitably tolled while the insurer was investigating the claim
BWithin 60 days of the dated written denial letter issued by the insurer's adjuster, after which the policy claim is forever barred
CWithin 4 years of the written denial under the general written-contract statute of limitations, with no equitable tolling for the insurer's investigation period
DWithin 10 years under Code Civ. Proc. § 337.15, the latent construction-defect statute of repose applicable to improvements
Why

12 months from inception of loss, tolled during investigation per Prudential-LMI.

California state law module

State-specific laws and regulations make up 10–20% of the CA P&C exam. Our markdown-based state-law module walks through what CDI actually tests.

Read CA P&C state law

California P&C Exam FAQ

How long is the CA P&C exam?

California Department of Insurance allows 195 minutes for the California Property & Casualty exam, and the passing score is 60%. The state does not publish a scored-question count. Our mock exam runs 100 questions in 120 minutes.

What's the passing score for CA P&C?

60% is the passing score in California, calculated against the scored question count. CDI reports results immediately at the test center.

How long should I study for the CA P&C exam?

Most P&C candidates spend 40–80 hours over 3–6 weeks. Start with the free diagnostic — it’ll tell you which sections to focus on instead of cramming the whole outline evenly.

Where do I take the California P&C exam?

CDI contracts with major proctored-exam vendors. Check the California Department of Insurance website for an up-to-date list of test centers in California.

Are these practice questions matched to the CA outline?

Yes — we follow the CDI content outline section by section, and our CA P&C bank includes 445 state-tagged items alongside the national NAIC content. Mock exams are composed from real section weights, not a generic question dump.

How much does EstatePass cost? Do I need a separate plan for P&C?

No — one EstatePass Pro plan covers Real Estate, Insurance License (L&H / P&C / Personal Lines), MLO, and Contractor exam prep. Free tier includes 10 practice answers/day and the diagnostic. Pro is $9.99/mo, $19.99/quarter, or $39.99 Lifetime — unlimited practice, mock exams, AI tier-3 explanations, and every channel.

Before you book

Exam formats, retakes and study guides

Open a guide collection to check delivery options and next steps. These editorial guides do not establish state-specific practice coverage.