You discover that the building plans show a shear wall design that doesn't meet current CBC requirements for the project's seismic design category. What is your first course of action?
Correct Answer
C) Stop work and notify the engineer and building department
Any structural design deficiencies must be addressed by the engineer of record, and the building department must be notified before proceeding with construction.
Why This Is the Correct Answer
A contractor who discovers a structural deficiency in approved plans must stop work on the affected portion and notify both the engineer of record and the building department. The engineer of record must issue revised calculations and drawings; the building department must approve the revisions before work can continue. This protects public safety, the contractor's license, and project liability.
Why the Other Options Are Wrong
Option A: Proceed with construction as shown on the plans
Proceeding with a design the contractor knows does not meet current code is negligent. Even if the plans were approved at permit issuance, the contractor's independent knowledge of the deficiency creates a duty to disclose.
Option B: Add extra fasteners to compensate for the deficiency
Adding extra fasteners without engineering authorization is an unauthorized design modification. The shear wall's deficiency may involve more than fastener spacing — panel thickness, hold-down requirements, or chord members may also be inadequate. Self-prescribing fixes is practicing structural engineering without a license.
Option D: Modify the design yourself based on code requirements
Modifying the design independently, even using correct code values, constitutes unlicensed practice of engineering. All structural modifications must come from the licensed engineer of record and be reflected in revised approved plans.
Memory Technique
When you find a code deficiency in structural plans: STOP → NOTIFY (engineer + building dept) → WAIT for revised approved plans. Never self-prescribe structural fixes.
More California Questions
A contractor is installing shear walls in a residence located in Seismic Design Category D. The engineer's plans call for 15/32-inch structural sheathing with 8d nails at 6 inches on center at panel edges. The contractor wants to substitute 7/16-inch OSB with the same nailing. Is this substitution acceptable?
You are reviewing plans for a mixed-use building where the ground floor will house a restaurant with commercial kitchen equipment. The architect has specified standard residential electrical requirements throughout. What Title 24 compliance issue should you identify?
According to CBC seismic provisions, what is the concept behind the 'strong column, weak beam' design philosophy?
A residence in California has 2,800 sq ft of conditioned space. The HVAC system efficiency is 16 SEER. What is the approximate Title 24 compliance margin compared to the minimum 14 SEER requirement?
You're constructing a foundation on liquefiable soils identified in a California coastal area. The geotechnical report recommends deep foundations. Which option is most commonly specified?
A contractor is installing a heat recovery ventilation (HRV) system to comply with Title 24. The system serves a 2,000 sq ft house with 3 bedrooms. What is the minimum required ventilation rate?
During construction of a basement in sandy soil conditions, you encounter groundwater at 4 feet below grade. The basement extends 8 feet below grade. What is the critical design consideration per CBC?
During a seismic retrofit project, you discover that existing concrete has a compressive strength of 2,200 psi. The engineer specifies new anchor bolts that require 2,500 psi minimum concrete strength. What is the most appropriate action?
What is the maximum allowable notch depth in a 2x10 floor joist per CBC requirements?
You're reviewing plans for a wood-framed structure in seismic design category D. The project calls for a shear wall with 15/32-inch structural sheathing and 8d nails spaced 6 inches on center at panel edges. What is the allowable shear value per the CBC?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Project Management
60 questions · 70% to pass
Related Study Resources
Previous Question
When designing a wood-framed structure in California, which seismic design category requires special moment frame construction for buildings over 35 feet in height?
Next Question
A building site has been classified as having Type F soil (poor soil requiring site-specific analysis). According to CBC seismic provisions, what additional requirement must be met before construction can begin?