Which mortar type is most appropriate for exterior walls below grade that will be subject to high lateral earth pressure?
Correct Answer
D) Type M mortar
Type M mortar has the highest compressive strength (2,500 psi minimum) and is specified for structures subject to high compressive loads, severe frost action, and high lateral earth pressure.
Why This Is the Correct Answer
Type M mortar has the highest compressive strength (2,500 psi minimum) and is specified for structures subject to high compressive loads, severe frost action, and high lateral earth pressure.
More NASCLA Questions
How long should daily reports and project correspondence typically be retained after project completion?
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
In CSI MasterFormat, which division covers earthwork and site preparation?
On an electrical plan, a rectangle with three parallel lines inside typically represents:
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During construction, the owner requests additional work valued at $125,000. The architect issues a change directive, but the contractor disputes the amount. Under typical AIA contract terms, how should the contractor proceed?
Next Question
During construction, the owner requests additional work that will increase the contract time by 15 days and cost by $75,000. What document should be executed before proceeding with this work?