EstatePass
North CarolinaNC Supplementeasy100% of exam part

What is the maximum single project limit for an intermediate general contractor license in North Carolina?

Correct Answer

B) $500,000

NC intermediate general contractor licenses have a maximum single project limit of $500,000.

Answer Options
A
$350,000
B
$500,000
C
$1,000,000
D
$650,000

Why This Is the Correct Answer

Option B ($500,000) is correct. The NC Licensing Board for General Contractors defines the intermediate classification as allowing single projects up to $500,000. This tier sits between the limited license ($500,000 and below per project, with aggregate limits) and the unlimited license.

Why the Other Options Are Wrong

Option A: $350,000

$350,000 does not correspond to any NC general contractor license classification threshold. It may be a distractor designed to catch candidates who remember the limit is in the hundreds of thousands but underestimate the exact figure.

Option C: $1,000,000

$1,000,000 exceeds the intermediate limit and is associated with moving toward unlimited license territory. Selecting this answer indicates confusion between intermediate and unlimited license tiers.

Option D: $650,000

$650,000 is above the intermediate limit and does not correspond to any defined NC license classification threshold. It may appeal to candidates who think the limit is 'around $500,000–$750,000' and guess high.

Memory Technique

NC GC License tiers: Limited → Intermediate → Unlimited. Intermediate = '$500K single project.' Think of it as the 'half-million handshake' — the intermediate license unlocks the ability to take on half-million-dollar projects. Below that is limited; above requires unlimited.

Was this explanation helpful?

More North Carolina Questions

A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?

A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?

A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?

A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?

A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?

A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?

A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?

A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?

Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:

Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000:

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.