EstatePass
VirginiaVA Supplementhard100% of exam part

Under Virginia environmental law, what is the minimum distance a construction site must maintain from a wetland without a permit?

Correct Answer

B) 100 feet

Virginia environmental regulations require a 100-foot buffer from wetlands for construction activities without specific permits.

Answer Options
A
200 feet
B
100 feet
C
50 feet
D
25 feet

Why This Is the Correct Answer

Virginia's Chesapeake Bay Preservation Act and related wetland regulations establish a 100-foot resource protection area (RPA) buffer around tidal wetlands and other sensitive areas. Construction activities within this buffer require specific permits and are otherwise prohibited to protect water quality and wetland ecosystems.

Why the Other Options Are Wrong

Option A: 200 feet

200 feet exceeds the standard buffer requirement. While some local jurisdictions or specific project types may require larger buffers, the standard regulatory minimum without a permit is 100 feet.

Option C: 50 feet

50 feet is insufficient under Virginia environmental regulations. A 50-foot buffer does not meet the minimum protection standard for wetlands under the Chesapeake Bay Preservation Act framework.

Option D: 25 feet

25 feet is far below the required minimum. Such a small buffer would allow construction activity dangerously close to wetland ecosystems, which is inconsistent with Virginia's environmental protection framework.

Memory Technique

100 feet = 'One football field from a wetland.' Virginia protects its wetlands with a full football field of buffer before you can build without a permit.

Was this explanation helpful?

More Virginia Questions

Under Virginia law (Title 54.1), what is the minimum net worth requirement for a Class A contractor license?

A Virginia contractor fails to pay a subcontractor $18,500 for completed work. Under Virginia mechanics lien law, within how many days must the subcontractor file a memorandum of lien to preserve their lien rights?

A Virginia contractor employs 8 workers with a total annual payroll of $420,000. Using the standard construction rate of $8.50 per $100 of payroll, what is the annual workers' compensation premium?

A Virginia contractor fails to pay subcontractors on a $180,000 project. Under Virginia mechanics lien law, what is the maximum time period a subcontractor has to file a mechanics lien after last furnishing labor or materials?

Under Virginia contractor law, what happens to a contractor's license if they fail to maintain required insurance coverage?

A contractor fails to pay a subcontractor and the subcontractor files a mechanics lien. Under Virginia law, within how many days must the general contractor post a bond to release the lien from the property?

A Class B contractor in Virginia completed $850,000 worth of work in the current license period and has contracts totaling $1,200,000 for the next period. What action must the contractor take?

A homeowner hired an unlicensed contractor for a $45,000 kitchen renovation. Under Virginia law, what remedy is available to the homeowner?

Calculate the required bond amount for a Virginia Class A contractor with average annual gross receipts of $2,800,000 over the past three years.

A Class C contractor in Virginia wants to install a residential HVAC system valued at $12,000. The contractor's specialty classification is electrical work. What must the contractor do to legally perform this work?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.