Under the USBC, what is the maximum allowable slope for a wheelchair ramp in new construction?
Correct Answer
B) 1:12 (8.33%)
The Virginia USBC follows ADA requirements for wheelchair ramps, which specify a maximum slope of 1:12 (8.33%) for new construction.
Why This Is the Correct Answer
The Virginia Uniform Statewide Building Code (USBC) incorporates ADA accessibility standards, which set the maximum wheelchair ramp slope at 1:12 — meaning 1 inch of rise for every 12 inches of horizontal run, equivalent to 8.33%. This is the universally recognized maximum for accessible ramps in new construction and is codified in both the ADA Standards for Accessible Design and the International Building Code (IBC) as adopted by Virginia.
Why the Other Options Are Wrong
Option A: 1:16 (6.25%)
1:16 (6.25%) is a gentler slope than 1:12 and would be perfectly acceptable for a ramp. However, it is not the maximum slope — it is more gradual than required. The question asks for the maximum, which is 1:12. A 1:16 slope is compliant, but it does not represent the regulatory ceiling.
Option C: 1:8 (12.5%)
1:8 (12.5%) is steeper than the maximum allowable slope and would not comply with ADA or USBC requirements. Ramps this steep are considered unsafe for wheelchair users and are not permitted in new construction.
Option D: 1:20 (5%)
1:20 (5%) is a very gentle, highly accessible slope, often used in site design where space permits. Like 1:16, it is compliant but represents a more gradual incline than the regulatory maximum. The maximum is 1:12, not 1:20.
Memory Technique
Wheelchair ramp max slope = 1:12. Remember: '1 inch up for every 12-inch foot of run.' Think of a standard ruler: 12 inches long, 1 inch rise. Or: 'ADA's 12 apostles' — the 12 in 1:12 is the key ADA ramp number.
More Virginia Questions
Under Virginia law (Title 54.1), what is the minimum net worth requirement for a Class A contractor license?
A Virginia contractor fails to pay a subcontractor $18,500 for completed work. Under Virginia mechanics lien law, within how many days must the subcontractor file a memorandum of lien to preserve their lien rights?
A Virginia contractor employs 8 workers with a total annual payroll of $420,000. Using the standard construction rate of $8.50 per $100 of payroll, what is the annual workers' compensation premium?
A Virginia contractor fails to pay subcontractors on a $180,000 project. Under Virginia mechanics lien law, what is the maximum time period a subcontractor has to file a mechanics lien after last furnishing labor or materials?
Under Virginia contractor law, what happens to a contractor's license if they fail to maintain required insurance coverage?
A contractor fails to pay a subcontractor and the subcontractor files a mechanics lien. Under Virginia law, within how many days must the general contractor post a bond to release the lien from the property?
A Class B contractor in Virginia completed $850,000 worth of work in the current license period and has contracts totaling $1,200,000 for the next period. What action must the contractor take?
A homeowner hired an unlicensed contractor for a $45,000 kitchen renovation. Under Virginia law, what remedy is available to the homeowner?
Calculate the required bond amount for a Virginia Class A contractor with average annual gross receipts of $2,800,000 over the past three years.
A Class C contractor in Virginia wants to install a residential HVAC system valued at $12,000. The contractor's specialty classification is electrical work. What must the contractor do to legally perform this work?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Project Management
60 questions · 70% to pass
Related Study Resources
Previous Question
A Virginia contractor's license expires on April 30th. If the contractor continues working without renewal, what is the penalty structure under Title 54.1?
Next Question
A Virginia contractor discovers they need to remove asbestos-containing materials during a renovation project. Under Virginia environmental law, what is required before beginning removal?