Under NC environmental regulations, which activity requires a Sedimentation and Erosion Control permit?
Correct Answer
C) Disturbing one or more acres of land
NC environmental regulations require Sedimentation and Erosion Control permits for any land-disturbing activity of one acre or more.
Why This Is the Correct Answer
The NC Sedimentation Pollution Control Act requires a Sedimentation and Erosion Control plan (effectively a permit) for any land-disturbing activity that disturbs one or more acres of land. This acreage-based threshold is the standard trigger for permit requirements.
Why the Other Options Are Wrong
Option A: Any construction project over $100,000
Project cost over $100,000 is not a trigger for sedimentation and erosion control permits. NC uses land disturbance area (acreage) as the criterion, not project dollar value. A small excavation project costing $200,000 may not require a permit if it disturbs less than an acre.
Option B: Any excavation over 500 cubic yards
Volume of excavation (500 cubic yards) is not the regulatory threshold. NC regulations focus on the surface area disturbed, not the volume of material moved. A deep but compact excavation might disturb little surface area.
Option D: Projects within 100 feet of waterways
Proximity to waterways (within 100 feet) triggers riparian buffer rules and stream buffer regulations, not the sedimentation and erosion control permit requirement. The permit threshold is based on disturbed acreage, not distance from a water body.
Memory Technique
One Acre = One Permit. Think of a football field (roughly one acre) β if your project disturbs an area the size of a football field, you need the permit. Keep it simple: '1 acre = 1 permit.'
More North Carolina Questions
A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?
A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?
A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?
A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?
A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?
A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?
A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?
A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?
Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:
Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000:
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Calculate the workers' compensation premium for a North Carolina framing contractor with $450,000 in annual payroll. The rate for carpentry work is $8.50 per $100 of payroll.
Next Question
Which North Carolina building code governs the construction of single-family residential dwellings?