Under NC environmental regulations, what is the minimum distance a construction site dewatering discharge must be from a storm drain inlet?

Correct Answer

A) 50 feet

NC environmental regulations require construction dewatering discharge to be at least 50 feet from storm drain inlets to prevent contamination.

Answer Options
A
50 feet
B
25 feet
C
100 feet
D
75 feet

Why This Is the Correct Answer

NC environmental regulations require that construction dewatering discharge be located at least 50 feet from storm drain inlets. This buffer distance prevents sediment-laden dewatering water from entering the storm sewer system and ultimately reaching waterways.

Why the Other Options Are Wrong

Option B: 25 feet

25 feet is insufficient. The regulation requires a minimum of 50 feet, which is double this distance, to provide an adequate natural filtration buffer before water can reach a storm drain.

Option C: 100 feet

100 feet exceeds the required minimum. While greater separation is always beneficial from an environmental standpoint, the regulatory minimum is 50 feet, not 100. Choosing 100 feet would impose an unnecessarily restrictive standard beyond what the regulation requires.

Option D: 75 feet

75 feet is also not the correct regulatory minimum. This distance is between the actual requirement (50 feet) and the exaggerated option (100 feet), designed to test whether candidates know the precise regulatory figure.

Memory Technique

Remember '50 feet = half a football field.' Picture a dewatering pump set up half a football field away from the nearest storm drain β€” that is the NC environmental minimum.

Was this explanation helpful?

More North Carolina Questions

A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?

A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?

A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?

A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?

A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?

A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?

A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?

A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?

Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:

Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000:

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.