Under Louisiana environmental regulations, what is required before disturbing more than one acre of land for construction?
Correct Answer
C) NPDES stormwater permit
Louisiana requires an NPDES stormwater permit for construction activities disturbing one acre or more of land to prevent pollution runoff.
Why This Is the Correct Answer
The Clean Water Act's National Pollutant Discharge Elimination System (NPDES) program requires a stormwater construction permit (NOI filing) for any land disturbance of one acre or more. Louisiana administers this through the Louisiana Pollutant Discharge Elimination System (LPDES). The permit requires a Stormwater Pollution Prevention Plan (SWPPP) and implementation of best management practices (BMPs) to prevent sediment and pollutant runoff to waterways.
Why the Other Options Are Wrong
Option A: Environmental impact study
An environmental impact study (EIS) is required under NEPA for major federal actions or projects affecting federal land. It is not a general requirement for all one-acre-or-more construction disturbances on private land in Louisiana.
Option B: Wetlands delineation
Wetlands delineation is required when a project may affect wetlands subject to Section 404 of the Clean Water Act (Army Corps of Engineers jurisdiction). It is triggered by proximity to and potential impact on wetlands, not simply by disturbing one acre of land.
Option D: Soil contamination testing
Soil contamination testing (Phase I/II environmental site assessments) is typically required when purchasing contaminated or potentially contaminated property, or when required by a lender. It is not a universal requirement triggered by the one-acre land disturbance threshold.
Memory Technique
One Acre = NPDES. Think: 'An acre of dirt disturbed = a permit required for dirt in the water.' The NPDES stormwater permit is about keeping construction runoff out of waterways.
More Louisiana Questions
A contractor in Louisiana completes $85,000 worth of work on a residential project. The owner pays $70,000 but disputes the remaining $15,000. If the contractor files a lien claim, what percentage penalty can be awarded if the contractor prevails in court?
A contractor discovers contaminated soil during excavation that requires special disposal. The disposal cost is $12,000, and transportation is $3,500. If this was not foreseeable from the contract documents, who typically bears this cost under Louisiana law?
A construction worker is injured on a Louisiana job site. The contractor's workers' compensation carrier has 15 days to investigate. If they don't respond within this period, what happens to the claim?
Under Louisiana law, what is the minimum amount of workers' compensation insurance coverage required for construction contractors?
A contractor's employee is injured on a job site in Louisiana. The contractor has workers' compensation insurance. Which statement is correct regarding the employee's rights?
Under Louisiana Civil Code, if a building contract does not specify a completion date, when is the work considered to be due?
Under Louisiana building codes, what is the minimum width required for emergency egress windows in bedrooms?
A Class B contractor in Louisiana wants to bid on a project worth $175,000. What action must they take?
A contractor's worker is injured and files for workers' compensation. The injury occurred due to the worker's intoxication. Under Louisiana law, what is the likely outcome?
A general contractor discovers contaminated soil during excavation for a commercial project in Louisiana. Which state agency must be notified?