In a Quality Control (QC) program, who is typically responsible for implementing and monitoring quality standards?
Correct Answer
D) The contractor's own personnel
Quality Control (QC) is the contractor's responsibility and is implemented and monitored by the contractor's own personnel, while Quality Assurance (QA) may involve third parties.
Why This Is the Correct Answer
Quality Control (QC) is the contractor's responsibility and is implemented and monitored by the contractor's own personnel, while Quality Assurance (QA) may involve third parties.
More NASCLA Questions
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
In CSI MasterFormat, which division covers earthwork and site preparation?
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
What is the minimum preheat temperature for welding ASTM A992 steel when the ambient temperature is 15Β°F?
A general contractor's balance sheet shows total assets of $850,000, current liabilities of $320,000, and long-term debt of $180,000. What is the company's equity?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
According to the IBC, what is the minimum ceiling height required for occupied spaces in Group A (assembly) buildings?
Next Question
A contractor discovers unforeseen rock excavation that will cost an additional $45,000. The change order includes 15% markup for overhead and profit. If the owner retains 10% on all work, what is the net payment to the contractor for this change order?