In a high-humidity coastal area of Oahu, a contractor discovers termite damage during renovation. According to Hawaii regulations, what is the required treatment approach?
Correct Answer
D) Soil treatment and damaged wood replacement
Hawaii requires comprehensive soil treatment around the foundation perimeter and replacement of structurally damaged wood members when termite infestation is discovered.
Why This Is the Correct Answer
Hawaii regulations require a comprehensive two-part response to discovered termite infestation: (1) soil treatment around the foundation perimeter to eliminate termites at ground level and create a chemical barrier, and (2) replacement of all structurally compromised wood members to restore structural integrity. Neither action alone is sufficient.
Why the Other Options Are Wrong
Option A: Surface spray treatment only
Surface spray treatment only addresses termites on exposed surfaces and does not eliminate colonies in the soil or within wood framing. This is inadequate for structural protection and does not meet Hawaii's regulatory requirements.
Option B: Fumigation followed by monitoring
Fumigation followed by monitoring is used for drywood termite treatment (tent fumigation) but does not address subterranean termites originating in the soil, nor does it require replacement of already-damaged structural members.
Option C: Boric acid injection into all wood members
Boric acid injection into all wood members is not the standard regulatory requirement. While boric acid is a legitimate treatment method, Hawaii's code mandates soil treatment and structural wood replacement β not injection of all members.
Memory Technique
Two-part rule: 'Treat the ground, replace the wood.' In Hawaii, termite response is always a double action β kill the colony in the soil AND restore structural members that were damaged.
More Hawaii Questions
A concrete mix design for coastal construction specifies a water-cement ratio of 0.40. If 650 lbs of cement is used per cubic yard, how many gallons of water should be added?
A contractor is installing hurricane straps rated at 1,500 pounds each. If the calculated uplift force on a rafter is 3,200 pounds, how many straps are required with a 2.0 safety factor?
Hawaii Building Code requires special inspection for concrete placement in seismic design categories. What is the minimum frequency for concrete strength testing?
What is the maximum allowable deflection for roof rafters under design wind loads in Hawaii's hurricane zones?
Which roofing attachment method is specifically required in Hawaii's hurricane zones for asphalt shingles on residential construction?
A building in Maui requires hurricane straps rated for 175 mph winds. If each strap must resist 1,200 lbs of uplift force and you have 48 roof-to-wall connections, what is the total uplift resistance provided?
During construction of a beachfront property, you notice white crystalline deposits forming on the concrete surface. This indicates:
You discover expansive clay soil conditions during excavation for a residential foundation in Kona. The plasticity index is 28. What foundation system is most appropriate?
According to Hawaii building requirements, hurricane straps connecting roof trusses to wall plates must be rated for what minimum uplift force in high wind zones?
A concrete slab foundation in Hawaii requires a vapor barrier. Due to high humidity and frequent rainfall, what type of vapor barrier is most appropriate?