EstatePass
VirginiaVA Supplementmedium100% of exam part

Calculate the workers' compensation premium for a Virginia roofing contractor with $500,000 in annual payroll and a rate of $12.50 per $100 of payroll:

Correct Answer

C) $62,500

Premium = ($500,000 ÷ $100) × $12.50 = 5,000 × $12.50 = $62,500

Answer Options
A
$6,250
B
$125,000
C
$62,500
D
$40,000

Why This Is the Correct Answer

The formula for workers' compensation premium is: (Total Payroll ÷ $100) × Rate. Calculation: ($500,000 ÷ $100) × $12.50 = 5,000 × $12.50 = $62,500. This is the standard industry calculation method used by insurance carriers.

Why the Other Options Are Wrong

Option A: $6,250

$6,250 results from incorrectly dividing payroll by $1,000 instead of $100: ($500,000 ÷ $1,000) × $12.50 = $6,250. This uses the wrong divisor, making the premium 10 times too small.

Option B: $125,000

$125,000 results from multiplying payroll directly by the rate without dividing by 100 first: $500,000 × $12.50% = $62,500 — or possibly $500,000 × 0.25 = $125,000 via a different error. This does not apply the 'per $100' correctly.

Option D: $40,000

$40,000 does not result from any standard application of this formula and likely represents a misapplication of the rate (e.g., using $8 instead of $12.50 per $100).

Memory Technique

Workers' comp formula: Payroll ÷ 100, then × rate. Think of it as 'how many $100 chunks in the payroll?' $500,000 ÷ 100 = 5,000 chunks. Each chunk costs $12.50. 5,000 × $12.50 = $62,500.

Was this explanation helpful?

More Virginia Questions

Under Virginia law (Title 54.1), what is the minimum net worth requirement for a Class A contractor license?

A Virginia contractor fails to pay a subcontractor $18,500 for completed work. Under Virginia mechanics lien law, within how many days must the subcontractor file a memorandum of lien to preserve their lien rights?

A Virginia contractor employs 8 workers with a total annual payroll of $420,000. Using the standard construction rate of $8.50 per $100 of payroll, what is the annual workers' compensation premium?

A Virginia contractor fails to pay subcontractors on a $180,000 project. Under Virginia mechanics lien law, what is the maximum time period a subcontractor has to file a mechanics lien after last furnishing labor or materials?

Under Virginia contractor law, what happens to a contractor's license if they fail to maintain required insurance coverage?

A contractor fails to pay a subcontractor and the subcontractor files a mechanics lien. Under Virginia law, within how many days must the general contractor post a bond to release the lien from the property?

A Class B contractor in Virginia completed $850,000 worth of work in the current license period and has contracts totaling $1,200,000 for the next period. What action must the contractor take?

A homeowner hired an unlicensed contractor for a $45,000 kitchen renovation. Under Virginia law, what remedy is available to the homeowner?

Calculate the required bond amount for a Virginia Class A contractor with average annual gross receipts of $2,800,000 over the past three years.

A Class C contractor in Virginia wants to install a residential HVAC system valued at $12,000. The contractor's specialty classification is electrical work. What must the contractor do to legally perform this work?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.