CaliforniaTradeeasy20% of exam part

Calculate the total fenestration area allowed for a 1,800 sq ft residence in Climate Zone 12 under Title 24 prescriptive requirements.

Correct Answer

D) 360 sq ft

Title 24 allows maximum 20% fenestration area: 1,800 sq ft × 0.20 = 360 sq ft of windows and glazed doors.

Answer Options
A
450 sq ft
B
540 sq ft
C
270 sq ft
D
360 sq ft

Why This Is the Correct Answer

Title 24 prescriptive requirements allow a maximum of 20% of conditioned floor area for fenestration. Calculation: 1,800 sq ft × 0.20 = 360 sq ft. This is the maximum total area of windows, skylights, and glazed doors permitted under the prescriptive compliance path for Climate Zone 12.

Why the Other Options Are Wrong

Option A: 450 sq ft

450 sq ft represents 25% of 1,800 sq ft (1,800 × 0.25 = 450). This exceeds the 20% Title 24 prescriptive cap and is not compliant.

Option B: 540 sq ft

540 sq ft represents 30% of 1,800 sq ft (1,800 × 0.30 = 540). This significantly exceeds the 20% limit and would require a performance path analysis to justify.

Option C: 270 sq ft

270 sq ft represents 15% of 1,800 sq ft (1,800 × 0.15 = 270). While this would be code-compliant (under the limit), it is not the maximum ALLOWED — the question asks for the maximum permissible fenestration area, which is 20%.

Memory Technique

The formula is straightforward: Floor Area × 20% = Max Fenestration. For any Title 24 calculation question, multiply the given floor area by 0.20 and you have your answer.

Was this explanation helpful?

More California Questions

A contractor is installing shear walls in a residence located in Seismic Design Category D. The engineer's plans call for 15/32-inch structural sheathing with 8d nails at 6 inches on center at panel edges. The contractor wants to substitute 7/16-inch OSB with the same nailing. Is this substitution acceptable?

You are reviewing plans for a mixed-use building where the ground floor will house a restaurant with commercial kitchen equipment. The architect has specified standard residential electrical requirements throughout. What Title 24 compliance issue should you identify?

According to CBC seismic provisions, what is the concept behind the 'strong column, weak beam' design philosophy?

A residence in California has 2,800 sq ft of conditioned space. The HVAC system efficiency is 16 SEER. What is the approximate Title 24 compliance margin compared to the minimum 14 SEER requirement?

You're constructing a foundation on liquefiable soils identified in a California coastal area. The geotechnical report recommends deep foundations. Which option is most commonly specified?

A contractor is installing a heat recovery ventilation (HRV) system to comply with Title 24. The system serves a 2,000 sq ft house with 3 bedrooms. What is the minimum required ventilation rate?

During construction of a basement in sandy soil conditions, you encounter groundwater at 4 feet below grade. The basement extends 8 feet below grade. What is the critical design consideration per CBC?

During a seismic retrofit project, you discover that existing concrete has a compressive strength of 2,200 psi. The engineer specifies new anchor bolts that require 2,500 psi minimum concrete strength. What is the most appropriate action?

What is the maximum allowable notch depth in a 2x10 floor joist per CBC requirements?

You're reviewing plans for a wood-framed structure in seismic design category D. The project calls for a shear wall with 15/32-inch structural sheathing and 8d nails spaced 6 inches on center at panel edges. What is the allowable shear value per the CBC?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.