A building's HVAC system has a total cooling capacity of 180,000 BTU/hr. According to Title 24, what is the maximum allowable fan power for this system?

Correct Answer

A) 1.2 watts per CFM

Title 24 limits fan power to improve energy efficiency. For systems of this size, the maximum allowable fan power is typically 1.2 watts per CFM.

Answer Options
A
1.2 watts per CFM
B
2.0 watts per CFM
C
0.8 watts per CFM
D
1.5 watts per CFM

Why This Is the Correct Answer

Title 24 Part 6 (California Energy Code) sets the maximum allowable fan power at 1.2 watts per CFM for HVAC systems of this size class. This limit applies to the supply fan and is designed to ensure energy-efficient air distribution without excessive motor power consumption.

Why the Other Options Are Wrong

Option B: 2.0 watts per CFM

2.0 watts per CFM exceeds the Title 24 maximum by a significant margin. A system drawing 2.0 W/CFM would fail the energy compliance check and would not receive a building permit in California.

Option C: 0.8 watts per CFM

0.8 watts per CFM is below the code limit, so it would be permissible—but the question asks for the maximum allowable value, not a conservative target. This answer confuses a compliant value with the code ceiling.

Option D: 1.5 watts per CFM

1.5 watts per CFM surpasses the 1.2 W/CFM ceiling set by Title 24 for this system size. Selecting this option indicates confusion with older or federal standards that used higher thresholds.

Memory Technique

Remember '1.2 is the key' — Title 24 fan power tops out at 1.2 W/CFM. You can associate the decimal '1.2' with a 12-inch ruler: one foot is the standard, nothing more allowed.

Was this explanation helpful?

More California Questions

A contractor is installing shear walls in a residence located in Seismic Design Category D. The engineer's plans call for 15/32-inch structural sheathing with 8d nails at 6 inches on center at panel edges. The contractor wants to substitute 7/16-inch OSB with the same nailing. Is this substitution acceptable?

You are reviewing plans for a mixed-use building where the ground floor will house a restaurant with commercial kitchen equipment. The architect has specified standard residential electrical requirements throughout. What Title 24 compliance issue should you identify?

According to CBC seismic provisions, what is the concept behind the 'strong column, weak beam' design philosophy?

A residence in California has 2,800 sq ft of conditioned space. The HVAC system efficiency is 16 SEER. What is the approximate Title 24 compliance margin compared to the minimum 14 SEER requirement?

You're constructing a foundation on liquefiable soils identified in a California coastal area. The geotechnical report recommends deep foundations. Which option is most commonly specified?

A contractor is installing a heat recovery ventilation (HRV) system to comply with Title 24. The system serves a 2,000 sq ft house with 3 bedrooms. What is the minimum required ventilation rate?

During construction of a basement in sandy soil conditions, you encounter groundwater at 4 feet below grade. The basement extends 8 feet below grade. What is the critical design consideration per CBC?

During a seismic retrofit project, you discover that existing concrete has a compressive strength of 2,200 psi. The engineer specifies new anchor bolts that require 2,500 psi minimum concrete strength. What is the most appropriate action?

What is the maximum allowable notch depth in a 2x10 floor joist per CBC requirements?

You're reviewing plans for a wood-framed structure in seismic design category D. The project calls for a shear wall with 15/32-inch structural sheathing and 8d nails spaced 6 inches on center at panel edges. What is the allowable shear value per the CBC?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.